For Lower Prices Than Online - Visit In Store, Call or Chat*
BUNDLE & SAVE UP TO 35% OFF* - Call, Chat + In Store Only
4.5 7312
GE Front Load Washer, 28 inch Width, ENERGY STAR Certified, 5.5 cu. ft. Capacity, 10 Wash Cycles, 5 Temperature Settings, Stackable, 1300 RPM Washer Spin Speed, Wifi Enabled, White colour
ENERGY STAR®
GE & Profile Washers 2024 GE & Profile Washers 2024
2KU9CF
Save An Additional 5% GST Instore, Chat or Phone
Save An Additional 5% GST Instore, Chat or Phone
Online Price🛈 Info
CAS sales staff have the ability to significantly discount most product prices below our online advertised prices especially when purchasing multiple products.
 
Visit one of our many Canadian showrooms or call 877-374-3439 to speak with our knowledgeable sales staff to get the best prices on your appliances
 
$1,198
MIX & MATCH!
NOW FOR A LIMITED TIME, buy 2 or more eligible major kitchen/laundry appliances from separate categories and save instantly!*
BUY 2 ITEMS, GET $150 OFF!
BUY 3 ITEMS, GET $400 OFF!
BUY 4 ITEMS, GET $650 OFF!
BUY 5 ITEMS, GET $800 OFF!
BUY 6 OR MORE ITEMS, GET $1,000 OFF!

Automatically applied during checkout or call 1-877-374-3439 to redeem this offer today! Show terms.
 Add to Cart
Call Local Showroom
Ratings & Reviews
4.5
89%
recommend this
Read Reviews
(7312 reviews)
GFD55GSSNWW
GFD55GSSNWW
Gas Dryer
$1,298
GFD55ESMNWW
GFD55ESMNWW
Electric Dryer
$1,198
GFP1528SNWW
GFP1528SNWW
Pedestal
$299
GFA28KITN
GFA28KITN
Stacking Kit
$99
Similar Colours and Options
2KU9CF
Region Availability:
In Stock
When will I get this?
 
Reserve & Pick Up
FREE
Distribution Centres
Address
Units Available
Woodbridge, ON
27 Director Crt.
In stock
Winnipeg, MB i
191 Elan Blvd
In stock
Burnaby, BC
8010 Winston St.
Ottawa, ON
55 Banton St.
Laval, QC i
1340 Boul. Dagenais Ouest
In stock
Dartmouth, NS i
315 Wilkinson Ave.
In stock
Calgary, AB i
2777 23 Ave. NE
In stock

Protect your purchase with an extended warranty.

Protect purchase for 2 years: $79.99 CAD
Protect purchase for 3 years: $129.99 CAD
In stock. Click here to see showrooms with this item on display to order.
  • Coquitlam
  • Laval South
  • Whitby / Oshawa
  • Winnipeg
  • Langley
  • Halifax
  • Dorval
  • Victoria
  • Gatineau
  • Mississauga
  • Saskatoon
  • Surrey
Out-of-box units available*
from $1,046.52 CAD
* In-store purchase only
Out-of-box units available only at:
  • Gatineau Showroom ($1,046.52 CAD)
    79 Boulevard de la Gappe Unit C6, Gatineau QC

Description & Features

GE Front Load Washer, 28 inch Width, ENERGY STAR Certified, 5.5 cu. ft. Capacity, 10 Wash Cycles, 5 Temperature Settings, Stackable, 1300 RPM Washer Spin Speed, Wifi Enabled, White colour
Built-in WiFi
Built-in WiFi
Start, stop and monitor your laundry from anywhere while receiving real-time notifications and updates
Microban® antimicrobial technology
Microban® antimicrobial technology
Built into components including the gasket, dispenser and draining system delivering protection that lives on load after load
  • Dynamic Balancing Technology (dBT™)

  • Our patented, time saving technology senses and rebalances uneven loads during the spin cycle, providing a quiet wash Play Video

  • UltraFresh Vent System With OdourBlock™

  • The first and only UltraFresh Vent System with OdourBlock™ eliminates excess moisture to help prevent odours ensuring your washer stays fresh and clean Play Video

    Sanitize with Oxi
    Sanitize with Oxi
    Remove 99.9% of bacteria with a dedicated cycle that uses an Oxi additive to boost your detergent s cleaning power, while keeping fabrics looking and feeling their best with each wash.

    Manufacturer's Warranty: 1 year

    Specs

    Capacity 5.5 cu. ft.
    Washer Options/Settings Extra Rinse
    Colour White
    Dispenser Bleach / Detergent (Liquid/Powder) / Fabric Softener
    Energy Star Yes
    LED Display Yes
    Maximum Spin Speed 1300 RPM
    Water Levels Precise Fill
    Wash/Rinse Temperatures 5
    Number of Wash Cycles 10
    Optional Soil Levels Extra Heavy / Heavy / Normal / Light / Extra Light
    Child Lock Yes
    Spin Speed 5 Speeds
    Style Front Load
    Control Type Central Knob + Electronic Touch
    Cycles Whites Delicates Rinse & Spin Quick Wash Cold Wash Normal Sanitize with Oxi Self-Clean Bulky Items
    Wash Basket Type Stainless Steel
    Volts / Hertz 120 v / 60 Hz
    Warranty 1 Year Parts & Labour
    Width 28"
    Wifi Enabled Yes
    LED Cycle Status Lights Yes
    Add Garment/Pause Yes
    Automatic Temperature Control Yes
    Depth with Door Open 90° (in.) 54.5
    Digital Cycle Countdown Yes
    Odour Block Capabilities UltraFresh Vent System™ with OdourBlock™
    Remote Start Yes
    Reversible Door Yes
    Matching Dryer - Electric GFD55ESMNWW
    Matching Dryer - Gas GFD55GSSNWW

    Manuals

    GE & Profile Washers 2024 GE & Profile Washers 2024

    Video

    GFW550SMNWW

    Reviews

    Rebates
    Warranty
    Financing
    Install
    Basic installation and delivery services are available from CAS
    Click here for more details.

    Advanced Installation Services (After Delivery)
    Offered by Quick Contractors®
    CAS Suggested Installation Provider
     1-877-694-3909
    To book service online please visit quicktask.com/cas

    SELECT CATEGORY FOR A LIST OF AVAILABLE INSTALLATION SERVICES

    Refrigerator

    Refrigerator Installation Service (New Waterline) by Quick Contractors

    Things to note:

    • This service should be purchased if an entirely new waterline is required.
    • If this is replacing your existing refrigerator, our delivery team will uncrate and move your new purchase into place. They will not plug it in.
    • If there is open floor access, 60 feet of waterline will be included in the installation.
    • The Quick Contractors installer will NOT remove packaging or provide haul away services.
    • Refrigerator door reversal service can be added for an extra cost. Please contact your local store for details.

    For a full list of requirements or further assistance please call 1-877-694-3909 or visit quicktask.com/cas

    Gas Range

    Gas Range Installation Service with New Flexible Hose by Quick Contractors

    Things to note:

    • This package does NOT include removal of any packaging.
    • This service does NOT include haul away.
    • Extra charges will apply if shut-off valves, gas permits or any custom carpentry work is needed to allow the new appliance to fit.
    • If a completely new installation is required please call 1-877-694-3909 or visit quicktask.com/cas to arrange for an on-site quotation. Once the on-site inspection is completed, a Quick Contractors installer will provide a detailed quotation of the work required and the associated cost. The quote includes all necessary plumbing, electrical, and any other trades and permits required to facilitate the completion of the new installation. All fees for an on-site inspection are non-refundable and must be paid for at your local CAS showroom.

    For a full list of requirements or further assistance please call 1-877-694-3909 or visit quicktask.com/cas

    WASHER & DRYER

    Gas Dryer Installation Service with New Flexible Hose by Quick Contractors

    Things to note:

    • This service should be purchased if there was an existing gas dryer in place before.
    • If a completely new installation is required please call 1-877-694-3909 or visit quicktask.com/cas to arrange for an on-site quotation. Once the on-site inspection is completed, a Quick Contractors installer will provide a detailed quotation of the work required and the associated cost. The quote includes all necessary plumbing, electrical, and any other trades and permits required to facilitate the completion of the new installation. All fees for an on-site inspection are non-refundable and must be paid for at your local CAS showroom.
    • The Quick Contractors installer will NOT remove packaging or provide haul away services.
    • Extra charges will apply if any shut-off valves, gas permits, vent-less exhaust kits, conversion kits, vent hose, stacking of items, expansion and reduction adapters, or custom carpentry work is needed to allow the new appliance to fit.


    White Glove Dryer (Electric only!) Installation

    Things to note:

    • Delivery person will complete this at the time of delivery.
    • Additional charges will apply at point of purchase.



    White Glove Washing Machine Installation

    Things to note:

    • Delivery person will complete this at the time of delivery.
    • Additional charges will apply at point of purchase.

    For a full list of requirements or further assistance please call 1-877-694-3909 or visit quicktask.com/cas

    Dishwasher

    Dishwasher with Hose Installation and Haul Away Service

    Things to note:

    • Delivery person will pick-up and deliver the unit and remove its packaging.
    • This is a basic installation into an existing outlet.
    • A 6 feet stainless steel braided fill hose (supply line) is included with this installation service.
    • Delivery person will haul away the old unit and dispose of all packing and materials.
    • Extra charges will apply if any risers, air gaps, pigtails, elbows, on/off switches, working in crawl spaces, or custom carpentry work is needed to remove old unit.
    • If a completely new installation is required please call 1-877-694-3909 or visit quicktask.com/cas to arrange for an on-site quotation. Once the on-site inspection is completed, a Quick Contractors installer will provide a detailed quotation of the work required and the associated cost. The quote includes all necessary plumbing, electrical, and any other trades and permits required to facilitate the completion of the new installation. All fees for an on-site inspection are non-refundable and must be paid for at your local CAS showroom.


    Dishwasher with Hose Installation Service

    Things to note:

    • This is a basic installation into an existing outlet.
    • You must remove the packaging prior to the installation.
    • Your unit should be placed near the intended installation site in advance of the Quick Contractor installer's arrival, unless appliance delivery has been purchased.
    • Please disconnect your existing unit.
    • A 6 feet stainless steel braided fill hose (supply line) is included with this installation service.
    • Extra charges will apply if any risers, air gaps, pigtails, elbows, on/off switches, working in crawl spaces, or custom carpentry work is needed to remove the old unit.
    • If a completely new installation is required please call 1-877-694-3909 or visit quicktask.com/cas to arrange for an on-site quotation. Once the on-site inspection is completed, a Quick Contractors installer will provide a detailed quotation of the work required and the associated cost. The quote includes all necessary plumbing, electrical, and any other trades and permits required to facilitate the completion of the new installation. All fees for an on-site inspection are non-refundable and must be paid for at your local CAS showroom.

    For a full list of requirements or further assistance please call 1-877-694-3909 or visit quicktask.com/cas

    Range Hood

    Range Hood (Ductless) Installation by Quick Contractors

    Things to note:

    • This service does NOT include haul away and/or disposal of packaging.
    • If a completely new installation is required please call 1-877-694-3909 or visit quicktask.com/cas to arrange for an on-site quotation. Once the on-site inspection is completed, a Quick Contractors installer will provide a detailed quotation of the work required and the associated cost. The quote includes all necessary plumbing, electrical, and any other trades and permits required to facilitate the completion of the new installation. All fees for an on-site inspection are non-refundable and must be paid for at your local CAS showroom.


    Range Hood (Ducted) Installation by Quick Contractors

    Things to note:

    • This service does NOT include haul away and/or disposal of packaging.
    • If a completely new installation is required please call 1-877-694-3909 or visit quicktask.com/cas to arrange for an on-site quotation. Once the on-site inspection is completed, a Quick Contractors installer will provide a detailed quotation of the work required and the associated cost. The quote includes all necessary plumbing, electrical, and any other trades and permits required to facilitate the completion of the new installation. All fees for an on-site inspection are non-refundable and must be paid for at your local CAS showroom.


    Vent Hood or Island Canopy Installation by Quick Contractors

    Things to note:

    • This package does NOT include moving the existing duct work, or any drywall patching or painting.
    • This service does NOT include haul away and/or disposal of packaging.
    • If a completely new installation is required please call 1-877-694-3909 or visit quicktask.com/cas to arrange for an on-site quotation. Once the on-site inspection is completed, a Quick Contractors installer will provide a detailed quotation of the work required and the associated cost. The quote includes all necessary plumbing, electrical, and any other trades and permits required to facilitate the completion of the new installation. All fees for an on-site inspection are non-refundable and must be paid for at your local CAS showroom.

    For a full list of requirements or further assistance please call 1-877-694-3909 or visit quicktask.com/cas

    OTR – Microwave

    The Quick Contractors Installer will:

    • Remove packaging from unit and inspect prior to installation
    • Disconnect electrical service to existing OTR
    • Disconnect Duct
    • Mount, center (if possible) and secure support bracket for new OTR as required by manufacturer’s specifics
    • Check and rotate, if necessary, exhaust fan, as required for excising ventilation
    • Connect and seal to existing duct, if necessary
    • Plug OTR cord into receptacle and secure with hardware provided
    • Install all accessory filters, covers, panels and/or racks
    • Test OTR by activating and monitoring a heating cell (using container filled with water), the exhaust fan and all lights and remaining accessories
    • If OTR is mounted using ductless application, installer will ensure accessory charcoal filter is properly installed


    Note: All associated packaging of the unit that was installed will be broken down and placed in storage location OR outside as required


    Common Overages:

    • Dedicated 110-volt electrical line
    • Changing a round vent to a rectangular vent OR vice versa
    • Installing an electrical receptacle box if improper service was sold
    • Additional duct work to allow transition from eternal exhaust to recirculating OR vise versa
    • Carpentry work to allow new OTR to fit


    For a full list of requirements or further assistance please call 1-877-694-3909 or visit quicktask.com/cas

    Electric Cooktop

    The Quick Contractors Installer will:

    • Remove packaging from unit and inspect prior to installation
    • Set cooktop into opening
    • Extend leveling brackets to floor of cabinet so cooktop sits straight
    • Secure the cooktop to the countertop
    • Screw leveling brackets to bottom of cabinet
    • Run appropriate power cable into cabinet
    • Connect cooktop to electrical box and receptacle
    • Plug cooktop power cord into outlet
    • Test Cooktop by activating and monitoring all surface burner elements, all controls, accessories (Clock, timer, setting, etc.)


    Note: All associated packaging of the unit that was installed will be broken down and placed in storage location OR outside as required


    Common Overages:

    • Carpentry work to allow the new appliance to fit

    For a full list of requirements or further assistance please call 1-877-694-3909 or visit quicktask.com/cas

    Gas Cooktop

    The Quick Contractors Installer will:

    • Remove packaging from unit and inspect prior to installation
    • Terminate gas service from shut-off valve, verify gas is turned off at shut-off valve and then disconnect gas from appliance. If no shut off valve is present, additional charges can be applied to terminate gas service and install shut-off valve, but not to exceed authorized additional charge estimate provided to customer
    • Secure the Cooktop to the countertop
    • Screw leveling brackets to bottom of cabinet
    • Extend leveling brackets to floor of cabinet so cooktop sits straight
    • Connect cooktop to electrical box and receptacle and plug cooktop power cord into outlet
    • Run appropriate power cable into cabinet
    • Ensure line is capped and there are no leaks
    • Connect gas service and ventilation to new gas appliance
    • Turn gas service back on and test all connections for leaks
    • Monitor gas service and ensure there are no leaks
    • Ensure all accessories; (grease, pants, racks, burner faps, lint filter, etc.) are installed on appliance
    • Test gas appliance by activating and monitoring all surface burner elements, all controls, accessories (Clock, timer, setting, etc.), all ventilation connections (Check exterior wall cap for debris), Ensure all burner elements are adjusted according to display proper flame characteristics
    • Includes new mandatory flex hose required by code


    Note: All associated packaging of the unit that was installed will be broken down and placed in storage location OR outside as required


    Common Overages:

    • Shut off valve
    • Conversion kits
    • Custom carpentry work to allow the new appliance to fit

    For a full list of requirements or further assistance please call 1-877-694-3909 or visit quicktask.com/cas

    Wall Oven Single

    The Quick Contractors Installer will:

    • A two-person team will install single wall ovens
    • Terminate electrical service for electric oven and disconnect from appliance
    • Ensure electrical cord has been unplugged to prevent damage to receptacle
    • Connect electrical service to new electric oven
    • Ensure all accessories (grates, pants, racks, burns caps, etc.) are installed on appliance
    • Test wall oven by activating and monitoring all surface burner elements, broiler, oven OR interior heating elements, all controls, accessories (clock, timer, setting, etc.), oven door, storage drawer, and ensure all burner elements are adjusted accordingly


    Note: All associated packaging of the unit that was installed will be broken down and placed in storage location OR outside as required


    Common Overages:

    • Shelf build-up when new unit is shorter than old
    • Converting from gas to electric OR vise versa (may require electrician and/ or local gas provider)
    • Customer carpentry work to allow new appliance to fit

    For a full list of requirements or further assistance please call 1-877-694-3909 or visit quicktask.com/cas

    BBQ Assembly in Home

    The Quick Contractors Installer will:

    • Un-package and inspect the unit to ensure there are no missing or damaged pieces
    • Assembly of the BBQ
    • Installation of any accessories such as the ignitor, side burner, etc.
    • Review installation and proper operation with customer upon completion
    • Final clean up of job site


    Note: All associated packaging of the unit that was installed will be broken down and placed in storage location OR outside as required

    For a full list of requirements or further assistance please call 1-877-694-3909 or visit quicktask.com/cas

    ADDITIONAL SERVICES


    If you do not see the service you require, please reach out to us. There are a wide arrangement of services available that may not be listed.


    For a full list of requirements or further assistance please call 1-877-694-3909 or visit quicktask.com/cas
    Delivery