Jenn-Air Pro Style JDB9000CWP Dishwasher, 24 inch Exterior Width, 46 dB Decibel Level, Fully Integrated, Stainless Steel (Interior), 6 Wash Cycles, 14 Capacity (Place Settings), Pro Style Stainless colour
Jenn-Air JDB9000CWP Stainless Steel Tub, Fully Integrated, 46 Dba, Trifecta Wash System, Sensor Wash, Percision Dry, 6 Cycles/5 Options, Premium Adjusters, Energy-star
Featuring a pressure-optimized, stainless steel wash arm, this Jenn-Air®#TriFecta™ dishwasher is as quiet as 46 decibels and offers a capacity of up to 14 place settings, perfect for families or couples that frequently entertain, and the Precision Dry® option gives this dishwasher exceptional drying performance.
Specifications Configuration and Overview- Tub Material: Stainless Steel
- Rack Material: Nylon
- Upper Adjustable Rack: 2 Position Removable
- Water Filtration System: Removable Filter
- CEE Tier: Tier I
- Energy Star® Qualified: ENERGY STAR® Qualified
- Number of Wash Cycles: 6
- Cycle Selections: 1-Hour Wash, Cookware/Bakeware, Light/China, Normal, Refresh/Rinse, Sensor Wash
- Option Selections: 4 Hour Delay, Control Lock, Hi Temp Wash, Precision Dry, Sani Rinse®
- Star K Compliant: Yes
Controls- Tub Material: Stainless Steel
- Rack Material: Nylon
- Upper Rack Extras: 1-Cupshelf w/ Integrated Stemware Holders, 4-Light Item Clips, 4-Stemware Holders
- Silverware Basket Type: Full Length Non Splittable
- Decibel Level: 46
Dimensions- Height: 34 1/2
- Width: 23 3/4
- Depth: 26 7/8
- Weight: 108
- Maximum Height: 34 1/2
- Minimum Height: 33 7/8
- Depth With Door Open 90 Degree: 49 3/4
- TriFecta™ Wash System
- No need to choose between brilliant cleaning, water/energy reduction and quieter operations because Jenn-Air® TriFecta™ dishwashers deliver all three. Its three-stage filtration, pressurized wash arms and alternating wash action in two wash zones yield superlative results.
- Precision Dry® Option
- A premium option that automatically and precisely pairs the optimal drying cycle with your selected wash cycle.
- Upper Rack with UltraGlide Rails
- A premium system with a strong and stable upper rack that glides smoothly on high-end rails, each with stainlesss steel ball bearings.
- Obsidian Racks
- Interior metal accents
- Stainless steel accents that showcase attention to detail with a substantial lower spray arm and upper rack handle, give a sense of the craftsmanship behind these dishwashers.
- Capacitive Touch Controls
- Premium controls that are activated by a gentle touch, look elegant and contemporary, and allow for easy cleaning.
- Exterior Cycle Indicator
- A light on the dishwasher's front panel that provides intuitive feedback on the wash cycle's status.
- Add Dish Indicator Light
- This indicator light lets you know when you are still able to add dishes to the load after starting a cleaning cycle.
- Sensor Wash Cycle with ClearScan™ Turbidity Sensor
- The most advanced and versatile cycle offered by Jenn-Air®, that calibrates your dishwasher to use the optimal wash cycle to clean your dishes based on load size and soil level.
- Refresh/Rinse Cycle
- Enjoy the convenience of prerinsing dishes without detergent when not planning to immediately run a full wash load, or refresh clean dishes before guests arrive.
- Stemware Clips
- Clips in the upper rack that hold stemware securely at the stem during washing, and can be folded down when not in use.
- Light Item Clips
- Clips that secure small or lightweight items for optimal cleaning. Easily repositionable where needed.
- Waterlock™ Flood Protection Technology
- A technology that detects excessive water, shuts off the dishwasher water supply (if necessary) and helps protect your kitchen.
Manufacturer's Warranty: 2 years
UPC: 883049328010
EAN: 0883049328010
Basic installation and delivery services are available from CAS
Advanced Installation Services (After Delivery)
Offered by Quick Contractors®
CAS Suggested Installation Provider
1-877-694-3909
To book service online please visit quicktask.com/cas
SELECT CATEGORY FOR A LIST OF AVAILABLE INSTALLATION SERVICES
Refrigerator Installation Service (New Waterline) by Quick Contractors
Things to note:
- This service should be purchased if an entirely new waterline is required.
- If this is replacing your existing refrigerator, our delivery team will uncrate and move your new purchase into place. They will not plug it in.
- If there is open floor access, 60 feet of waterline will be included in the installation.
- The Quick Contractors installer will NOT remove packaging or provide haul away services.
- Refrigerator door reversal service can be added for an extra cost. Please contact your local store for details.
Gas Range Installation Service with New Flexible Hose by Quick Contractors
Things to note:
- This package does NOT include removal of any packaging.
- This service does NOT include haul away.
- Extra charges will apply if shut-off valves, gas permits or any custom carpentry work is needed to allow the new appliance to fit.
- If a completely new installation is required please call 1-877-694-3909 or visit quicktask.com/cas to arrange for an on-site quotation. Once the on-site inspection is completed, a Quick Contractors installer will provide a detailed quotation of the work required and the associated cost. The quote includes all necessary plumbing, electrical, and any other trades and permits required to facilitate the completion of the new installation. All fees for an on-site inspection are non-refundable and must be paid for at your local CAS showroom.
Gas Dryer Installation Service with New Flexible Hose by Quick Contractors
Things to note:
- This service should be purchased if there was an existing gas dryer in place before.
- If a completely new installation is required please call 1-877-694-3909 or visit quicktask.com/cas to arrange for an on-site quotation. Once the on-site inspection is completed, a Quick Contractors installer will provide a detailed quotation of the work required and the associated cost. The quote includes all necessary plumbing, electrical, and any other trades and permits required to facilitate the completion of the new installation. All fees for an on-site inspection are non-refundable and must be paid for at your local CAS showroom.
- The Quick Contractors installer will NOT remove packaging or provide haul away services.
- Extra charges will apply if any shut-off valves, gas permits, vent-less exhaust kits, conversion kits, vent hose, stacking of items, expansion and reduction adapters, or custom carpentry work is needed to allow the new appliance to fit.
White Glove Dryer (Electric only!) Installation
Things to note:
- Delivery person will complete this at the time of delivery.
- Additional charges will apply at point of purchase.
White Glove Washing Machine Installation
Things to note:
- Delivery person will complete this at the time of delivery.
- Additional charges will apply at point of purchase.
Dishwasher with Hose Installation and Haul Away Service
Things to note:
- Delivery person will pick-up and deliver the unit and remove its packaging.
- This is a basic installation into an existing outlet.
- A 6 feet stainless steel braided fill hose (supply line) is included with this installation service.
- Delivery person will haul away the old unit and dispose of all packing and materials.
- Extra charges will apply if any risers, air gaps, pigtails, elbows, on/off switches, working in crawl spaces, or custom carpentry work is needed to remove old unit.
- If a completely new installation is required please call 1-877-694-3909 or visit quicktask.com/cas to arrange for an on-site quotation. Once the on-site inspection is completed, a Quick Contractors installer will provide a detailed quotation of the work required and the associated cost. The quote includes all necessary plumbing, electrical, and any other trades and permits required to facilitate the completion of the new installation. All fees for an on-site inspection are non-refundable and must be paid for at your local CAS showroom.
Dishwasher with Hose Installation Service
Things to note:
- This is a basic installation into an existing outlet.
- You must remove the packaging prior to the installation.
- Your unit should be placed near the intended installation site in advance of the Quick Contractor installer's arrival, unless appliance delivery has been purchased.
- Please disconnect your existing unit.
- A 6 feet stainless steel braided fill hose (supply line) is included with this installation service.
- Extra charges will apply if any risers, air gaps, pigtails, elbows, on/off switches, working in crawl spaces, or custom carpentry work is needed to remove the old unit.
- If a completely new installation is required please call 1-877-694-3909 or visit quicktask.com/cas to arrange for an on-site quotation. Once the on-site inspection is completed, a Quick Contractors installer will provide a detailed quotation of the work required and the associated cost. The quote includes all necessary plumbing, electrical, and any other trades and permits required to facilitate the completion of the new installation. All fees for an on-site inspection are non-refundable and must be paid for at your local CAS showroom.
Range Hood (Ductless) Installation by Quick Contractors
Things to note:
- This service does NOT include haul away and/or disposal of packaging.
- If a completely new installation is required please call 1-877-694-3909 or visit quicktask.com/cas to arrange for an on-site quotation. Once the on-site inspection is completed, a Quick Contractors installer will provide a detailed quotation of the work required and the associated cost. The quote includes all necessary plumbing, electrical, and any other trades and permits required to facilitate the completion of the new installation. All fees for an on-site inspection are non-refundable and must be paid for at your local CAS showroom.
Range Hood (Ducted) Installation by Quick Contractors
Things to note:
- This service does NOT include haul away and/or disposal of packaging.
- If a completely new installation is required please call 1-877-694-3909 or visit quicktask.com/cas to arrange for an on-site quotation. Once the on-site inspection is completed, a Quick Contractors installer will provide a detailed quotation of the work required and the associated cost. The quote includes all necessary plumbing, electrical, and any other trades and permits required to facilitate the completion of the new installation. All fees for an on-site inspection are non-refundable and must be paid for at your local CAS showroom.
Vent Hood or Island Canopy Installation by Quick Contractors
Things to note:
- This package does NOT include moving the existing duct work, or any drywall patching or painting.
- This service does NOT include haul away and/or disposal of packaging.
- If a completely new installation is required please call 1-877-694-3909 or visit quicktask.com/cas to arrange for an on-site quotation. Once the on-site inspection is completed, a Quick Contractors installer will provide a detailed quotation of the work required and the associated cost. The quote includes all necessary plumbing, electrical, and any other trades and permits required to facilitate the completion of the new installation. All fees for an on-site inspection are non-refundable and must be paid for at your local CAS showroom.
The Quick Contractors Installer will:
- Remove packaging from unit and inspect prior to installation
- Disconnect electrical service to existing OTR
- Disconnect Duct
- Mount, center (if possible) and secure support bracket for new OTR as required by manufacturer’s specifics
- Check and rotate, if necessary, exhaust fan, as required for excising ventilation
- Connect and seal to existing duct, if necessary
- Plug OTR cord into receptacle and secure with hardware provided
- Install all accessory filters, covers, panels and/or racks
- Test OTR by activating and monitoring a heating cell (using container filled with water), the exhaust fan and all lights and remaining accessories
- If OTR is mounted using ductless application, installer will ensure accessory charcoal filter is properly installed
Note: All associated packaging of the unit that was installed will be broken down and placed in storage location OR outside as required
Common Overages:
- Dedicated 110-volt electrical line
- Changing a round vent to a rectangular vent OR vice versa
- Installing an electrical receptacle box if improper service was sold
- Additional duct work to allow transition from eternal exhaust to recirculating OR vise versa
- Carpentry work to allow new OTR to fit
The Quick Contractors Installer will:
- Remove packaging from unit and inspect prior to installation
- Set cooktop into opening
- Extend leveling brackets to floor of cabinet so cooktop sits straight
- Secure the cooktop to the countertop
- Screw leveling brackets to bottom of cabinet
- Run appropriate power cable into cabinet
- Connect cooktop to electrical box and receptacle
- Plug cooktop power cord into outlet
- Test Cooktop by activating and monitoring all surface burner elements, all controls, accessories (Clock, timer, setting, etc.)
Note: All associated packaging of the unit that was installed will be broken down and placed in storage location OR outside as required
Common Overages:
- Carpentry work to allow the new appliance to fit
The Quick Contractors Installer will:
- Remove packaging from unit and inspect prior to installation
- Terminate gas service from shut-off valve, verify gas is turned off at shut-off valve and then disconnect gas from appliance. If no shut off valve is present, additional charges can be applied to terminate gas service and install shut-off valve, but not to exceed authorized additional charge estimate provided to customer
- Secure the Cooktop to the countertop
- Screw leveling brackets to bottom of cabinet
- Extend leveling brackets to floor of cabinet so cooktop sits straight
- Connect cooktop to electrical box and receptacle and plug cooktop power cord into outlet
- Run appropriate power cable into cabinet
- Ensure line is capped and there are no leaks
- Connect gas service and ventilation to new gas appliance
- Turn gas service back on and test all connections for leaks
- Monitor gas service and ensure there are no leaks
- Ensure all accessories; (grease, pants, racks, burner faps, lint filter, etc.) are installed on appliance
- Test gas appliance by activating and monitoring all surface burner elements, all controls, accessories (Clock, timer, setting, etc.), all ventilation connections (Check exterior wall cap for debris), Ensure all burner elements are adjusted according to display proper flame characteristics
- Includes new mandatory flex hose required by code
Note: All associated packaging of the unit that was installed will be broken down and placed in storage location OR outside as required
Common Overages:
- Shut off valve
- Conversion kits
- Custom carpentry work to allow the new appliance to fit
The Quick Contractors Installer will:
- A two-person team will install single wall ovens
- Terminate electrical service for electric oven and disconnect from appliance
- Ensure electrical cord has been unplugged to prevent damage to receptacle
- Connect electrical service to new electric oven
- Ensure all accessories (grates, pants, racks, burns caps, etc.) are installed on appliance
- Test wall oven by activating and monitoring all surface burner elements, broiler, oven OR interior heating elements, all controls, accessories (clock, timer, setting, etc.), oven door, storage drawer, and ensure all burner elements are adjusted accordingly
Note: All associated packaging of the unit that was installed will be broken down and placed in storage location OR outside as required
Common Overages:
- Shelf build-up when new unit is shorter than old
- Converting from gas to electric OR vise versa (may require electrician and/ or local gas provider)
- Customer carpentry work to allow new appliance to fit
The Quick Contractors Installer will:
- Un-package and inspect the unit to ensure there are no missing or damaged pieces
- Assembly of the BBQ
- Installation of any accessories such as the ignitor, side burner, etc.
- Review installation and proper operation with customer upon completion
- Final clean up of job site
Note: All associated packaging of the unit that was installed will be broken down and placed in storage location OR outside as required
If you do not see the service you require, please reach out to us. There are a wide arrangement of services available that may not be listed.