For Lower Prices Than Online - Visit In Store, Call or Chat*
BUNDLE & SAVE UP TO 35% OFF* - Call, Chat + In Store Only
LG Studio Kitchen + Laundry BUY 2 $400 Off, BUY 3+ $800 off!!!
Receive $200 Prepaid Visa Card on Selected Refrigerators!!!
4.5 146
Door swing must be completed by LG, or it will void warranty.
LG Bottom Freezer Refrigerator, 28 inch Width, ENERGY STAR Certified, 14.7 cu. ft. Capacity, Platinum Silver colour Door Cooling+
ENERGY STAR®
LG Fridges 2024 Line Up LG Fridges 2024 Line Up
2JGF68
Call, Chat Or Visit For Bundle Discounts
Call, Chat Or Visit For Bundle Discounts
Online MAP Price🛈 Info

MAP Price Explanation
  
Many appliance manufacturers mandate retailers to list product prices at minimum advertised prices (MAP Price). 


CAS sales staff have the ability to significantly discount most product prices below our online advertised prices especially when purchasing multiple products.
 
Visit one of our many Canadian showrooms or call 877-374-3439 to speak with our knowledgeable sales staff to get the best prices on your appliances










Excludes: LG 
$1,497
 Add to Cart
Call Local Showroom
Ratings & Reviews
4.5
94%
recommend this
Read Reviews
(146 reviews)
2JGF68
Region Availability:
In Stock
When will I get this?
 
Reserve & Pick Up
FREE
Distribution Centres
Address
Units Available
Woodbridge, ON i
27 Director Crt.
In stock
Winnipeg, MB i
191 Elan Blvd
In stock
Burnaby, BC
8010 Winston St.
In stock
Ottawa, ON i
55 Banton St.
In stock
Laval, QC i
1340 Boul. Dagenais Ouest
In stock
Dartmouth, NS i
315 Wilkinson Ave.
In stock
Calgary, AB i
2777 23 Ave. NE
In stock

Protect your purchase with an extended warranty.

Protect purchase for 2 years: $79.99 CAD
Protect purchase for 3 years: $129.99 CAD
In stock. Click here to see showrooms with this item on display to order.
  • Ottawa East
  • Whitby / Oshawa
  • Winnipeg North
  • Etobicoke
  • Winnipeg
  • Scarborough
  • Halifax
  • Vaughan
  • Edmonton
  • Toronto
  • Montréal
  • Surrey
Out-of-box units available*
from $838.08 CAD
* In-store purchase only
Out-of-box units available only at:
  • Vaughan Showroom ($838.08 CAD)
    27 Director Crt., Vaughan ON

Description & Features

LG Bottom Freezer Refrigerator, 28 inch Width, ENERGY STAR Certified, 14.7 cu. ft. Capacity, Platinum Silver colour Door Cooling+

Manufacturer's Warranty: 1 year

Specs

Refrigerator (cu.ft.) 10.0
Total (cu.ft.) 14.7
Energy Consumption (kWh/Year) 425
Ice System Twist Ice Tray
Smart Inverter Compressor Yes
Temperature Sensors 4
Display Type Membrane (White LED)
Door Alarm Yes
LoDecibel™ Quiet Operation Yes
No. of Shelves 3 Full (1 Folding)
Shelf Construction Tempered Glass
Refrigerator Light 1 Ceiling LED
Door Type Swing Door (Reversible)
Door Bin Construction 1 Piece (Clear)
Door Type Swing Door (Reversible)
Freezer Handle Horizontal Pocket Type
Contour Door Yes
Surface Smooth
Handles Vertical Pocket Type
Depth without Handles 27 5/8
Depth (Total with Door Open) 51 6/8
Height to Top of Door Hinge 67 6/8
Width (Door Open 90 with Handle) 29 6/8
Door Edge Clearance with Handle 4/8
Installation Clearance 4/8
Carton Dimensions (WxHxD) 29.3" x 69.8" x 30.8"
Parts & Labour 1 Year
Inverter Compressor 10 Years
(Platinum Silver PCM) 195174002582

Manuals

LG Fridges 2024 Line Up LG Fridges 2024 Line Up

Video

LBNC15251V

Reviews

Rebates
Warranty
Financing
Install
Basic installation and delivery services are available from CAS
Click here for more details.

Advanced Installation Services (After Delivery)
Offered by Quick Contractors®
CAS Suggested Installation Provider
 1-877-694-3909
To book service online please visit quicktask.com/cas

SELECT CATEGORY FOR A LIST OF AVAILABLE INSTALLATION SERVICES

Refrigerator

Refrigerator Installation Service (New Waterline) by Quick Contractors

Things to note:

  • This service should be purchased if an entirely new waterline is required.
  • If this is replacing your existing refrigerator, our delivery team will uncrate and move your new purchase into place. They will not plug it in.
  • If there is open floor access, 60 feet of waterline will be included in the installation.
  • The Quick Contractors installer will NOT remove packaging or provide haul away services.
  • Refrigerator door reversal service can be added for an extra cost. Please contact your local store for details.

For a full list of requirements or further assistance please call 1-877-694-3909 or visit quicktask.com/cas

Gas Range

Gas Range Installation Service with New Flexible Hose by Quick Contractors

Things to note:

  • This package does NOT include removal of any packaging.
  • This service does NOT include haul away.
  • Extra charges will apply if shut-off valves, gas permits or any custom carpentry work is needed to allow the new appliance to fit.
  • If a completely new installation is required please call 1-877-694-3909 or visit quicktask.com/cas to arrange for an on-site quotation. Once the on-site inspection is completed, a Quick Contractors installer will provide a detailed quotation of the work required and the associated cost. The quote includes all necessary plumbing, electrical, and any other trades and permits required to facilitate the completion of the new installation. All fees for an on-site inspection are non-refundable and must be paid for at your local CAS showroom.

For a full list of requirements or further assistance please call 1-877-694-3909 or visit quicktask.com/cas

WASHER & DRYER

Gas Dryer Installation Service with New Flexible Hose by Quick Contractors

Things to note:

  • This service should be purchased if there was an existing gas dryer in place before.
  • If a completely new installation is required please call 1-877-694-3909 or visit quicktask.com/cas to arrange for an on-site quotation. Once the on-site inspection is completed, a Quick Contractors installer will provide a detailed quotation of the work required and the associated cost. The quote includes all necessary plumbing, electrical, and any other trades and permits required to facilitate the completion of the new installation. All fees for an on-site inspection are non-refundable and must be paid for at your local CAS showroom.
  • The Quick Contractors installer will NOT remove packaging or provide haul away services.
  • Extra charges will apply if any shut-off valves, gas permits, vent-less exhaust kits, conversion kits, vent hose, stacking of items, expansion and reduction adapters, or custom carpentry work is needed to allow the new appliance to fit.


White Glove Dryer (Electric only!) Installation

Things to note:

  • Delivery person will complete this at the time of delivery.
  • Additional charges will apply at point of purchase.



White Glove Washing Machine Installation

Things to note:

  • Delivery person will complete this at the time of delivery.
  • Additional charges will apply at point of purchase.

For a full list of requirements or further assistance please call 1-877-694-3909 or visit quicktask.com/cas

Dishwasher

Dishwasher with Hose Installation and Haul Away Service

Things to note:

  • Delivery person will pick-up and deliver the unit and remove its packaging.
  • This is a basic installation into an existing outlet.
  • A 6 feet stainless steel braided fill hose (supply line) is included with this installation service.
  • Delivery person will haul away the old unit and dispose of all packing and materials.
  • Extra charges will apply if any risers, air gaps, pigtails, elbows, on/off switches, working in crawl spaces, or custom carpentry work is needed to remove old unit.
  • If a completely new installation is required please call 1-877-694-3909 or visit quicktask.com/cas to arrange for an on-site quotation. Once the on-site inspection is completed, a Quick Contractors installer will provide a detailed quotation of the work required and the associated cost. The quote includes all necessary plumbing, electrical, and any other trades and permits required to facilitate the completion of the new installation. All fees for an on-site inspection are non-refundable and must be paid for at your local CAS showroom.


Dishwasher with Hose Installation Service

Things to note:

  • This is a basic installation into an existing outlet.
  • You must remove the packaging prior to the installation.
  • Your unit should be placed near the intended installation site in advance of the Quick Contractor installer's arrival, unless appliance delivery has been purchased.
  • Please disconnect your existing unit.
  • A 6 feet stainless steel braided fill hose (supply line) is included with this installation service.
  • Extra charges will apply if any risers, air gaps, pigtails, elbows, on/off switches, working in crawl spaces, or custom carpentry work is needed to remove the old unit.
  • If a completely new installation is required please call 1-877-694-3909 or visit quicktask.com/cas to arrange for an on-site quotation. Once the on-site inspection is completed, a Quick Contractors installer will provide a detailed quotation of the work required and the associated cost. The quote includes all necessary plumbing, electrical, and any other trades and permits required to facilitate the completion of the new installation. All fees for an on-site inspection are non-refundable and must be paid for at your local CAS showroom.

For a full list of requirements or further assistance please call 1-877-694-3909 or visit quicktask.com/cas

Range Hood

Range Hood (Ductless) Installation by Quick Contractors

Things to note:

  • This service does NOT include haul away and/or disposal of packaging.
  • If a completely new installation is required please call 1-877-694-3909 or visit quicktask.com/cas to arrange for an on-site quotation. Once the on-site inspection is completed, a Quick Contractors installer will provide a detailed quotation of the work required and the associated cost. The quote includes all necessary plumbing, electrical, and any other trades and permits required to facilitate the completion of the new installation. All fees for an on-site inspection are non-refundable and must be paid for at your local CAS showroom.


Range Hood (Ducted) Installation by Quick Contractors

Things to note:

  • This service does NOT include haul away and/or disposal of packaging.
  • If a completely new installation is required please call 1-877-694-3909 or visit quicktask.com/cas to arrange for an on-site quotation. Once the on-site inspection is completed, a Quick Contractors installer will provide a detailed quotation of the work required and the associated cost. The quote includes all necessary plumbing, electrical, and any other trades and permits required to facilitate the completion of the new installation. All fees for an on-site inspection are non-refundable and must be paid for at your local CAS showroom.


Vent Hood or Island Canopy Installation by Quick Contractors

Things to note:

  • This package does NOT include moving the existing duct work, or any drywall patching or painting.
  • This service does NOT include haul away and/or disposal of packaging.
  • If a completely new installation is required please call 1-877-694-3909 or visit quicktask.com/cas to arrange for an on-site quotation. Once the on-site inspection is completed, a Quick Contractors installer will provide a detailed quotation of the work required and the associated cost. The quote includes all necessary plumbing, electrical, and any other trades and permits required to facilitate the completion of the new installation. All fees for an on-site inspection are non-refundable and must be paid for at your local CAS showroom.

For a full list of requirements or further assistance please call 1-877-694-3909 or visit quicktask.com/cas

OTR – Microwave

The Quick Contractors Installer will:

  • Remove packaging from unit and inspect prior to installation
  • Disconnect electrical service to existing OTR
  • Disconnect Duct
  • Mount, center (if possible) and secure support bracket for new OTR as required by manufacturer’s specifics
  • Check and rotate, if necessary, exhaust fan, as required for excising ventilation
  • Connect and seal to existing duct, if necessary
  • Plug OTR cord into receptacle and secure with hardware provided
  • Install all accessory filters, covers, panels and/or racks
  • Test OTR by activating and monitoring a heating cell (using container filled with water), the exhaust fan and all lights and remaining accessories
  • If OTR is mounted using ductless application, installer will ensure accessory charcoal filter is properly installed


Note: All associated packaging of the unit that was installed will be broken down and placed in storage location OR outside as required


Common Overages:

  • Dedicated 110-volt electrical line
  • Changing a round vent to a rectangular vent OR vice versa
  • Installing an electrical receptacle box if improper service was sold
  • Additional duct work to allow transition from eternal exhaust to recirculating OR vise versa
  • Carpentry work to allow new OTR to fit


For a full list of requirements or further assistance please call 1-877-694-3909 or visit quicktask.com/cas

Electric Cooktop

The Quick Contractors Installer will:

  • Remove packaging from unit and inspect prior to installation
  • Set cooktop into opening
  • Extend leveling brackets to floor of cabinet so cooktop sits straight
  • Secure the cooktop to the countertop
  • Screw leveling brackets to bottom of cabinet
  • Run appropriate power cable into cabinet
  • Connect cooktop to electrical box and receptacle
  • Plug cooktop power cord into outlet
  • Test Cooktop by activating and monitoring all surface burner elements, all controls, accessories (Clock, timer, setting, etc.)


Note: All associated packaging of the unit that was installed will be broken down and placed in storage location OR outside as required


Common Overages:

  • Carpentry work to allow the new appliance to fit

For a full list of requirements or further assistance please call 1-877-694-3909 or visit quicktask.com/cas

Gas Cooktop

The Quick Contractors Installer will:

  • Remove packaging from unit and inspect prior to installation
  • Terminate gas service from shut-off valve, verify gas is turned off at shut-off valve and then disconnect gas from appliance. If no shut off valve is present, additional charges can be applied to terminate gas service and install shut-off valve, but not to exceed authorized additional charge estimate provided to customer
  • Secure the Cooktop to the countertop
  • Screw leveling brackets to bottom of cabinet
  • Extend leveling brackets to floor of cabinet so cooktop sits straight
  • Connect cooktop to electrical box and receptacle and plug cooktop power cord into outlet
  • Run appropriate power cable into cabinet
  • Ensure line is capped and there are no leaks
  • Connect gas service and ventilation to new gas appliance
  • Turn gas service back on and test all connections for leaks
  • Monitor gas service and ensure there are no leaks
  • Ensure all accessories; (grease, pants, racks, burner faps, lint filter, etc.) are installed on appliance
  • Test gas appliance by activating and monitoring all surface burner elements, all controls, accessories (Clock, timer, setting, etc.), all ventilation connections (Check exterior wall cap for debris), Ensure all burner elements are adjusted according to display proper flame characteristics
  • Includes new mandatory flex hose required by code


Note: All associated packaging of the unit that was installed will be broken down and placed in storage location OR outside as required


Common Overages:

  • Shut off valve
  • Conversion kits
  • Custom carpentry work to allow the new appliance to fit

For a full list of requirements or further assistance please call 1-877-694-3909 or visit quicktask.com/cas

Wall Oven Single

The Quick Contractors Installer will:

  • A two-person team will install single wall ovens
  • Terminate electrical service for electric oven and disconnect from appliance
  • Ensure electrical cord has been unplugged to prevent damage to receptacle
  • Connect electrical service to new electric oven
  • Ensure all accessories (grates, pants, racks, burns caps, etc.) are installed on appliance
  • Test wall oven by activating and monitoring all surface burner elements, broiler, oven OR interior heating elements, all controls, accessories (clock, timer, setting, etc.), oven door, storage drawer, and ensure all burner elements are adjusted accordingly


Note: All associated packaging of the unit that was installed will be broken down and placed in storage location OR outside as required


Common Overages:

  • Shelf build-up when new unit is shorter than old
  • Converting from gas to electric OR vise versa (may require electrician and/ or local gas provider)
  • Customer carpentry work to allow new appliance to fit

For a full list of requirements or further assistance please call 1-877-694-3909 or visit quicktask.com/cas

BBQ Assembly in Home

The Quick Contractors Installer will:

  • Un-package and inspect the unit to ensure there are no missing or damaged pieces
  • Assembly of the BBQ
  • Installation of any accessories such as the ignitor, side burner, etc.
  • Review installation and proper operation with customer upon completion
  • Final clean up of job site


Note: All associated packaging of the unit that was installed will be broken down and placed in storage location OR outside as required

For a full list of requirements or further assistance please call 1-877-694-3909 or visit quicktask.com/cas

ADDITIONAL SERVICES


If you do not see the service you require, please reach out to us. There are a wide arrangement of services available that may not be listed.


For a full list of requirements or further assistance please call 1-877-694-3909 or visit quicktask.com/cas
Delivery