Smeg CPF30UGMWH
Smeg Range 2024 Line Up Smeg Range 2024 Line Up
2KN87V
Online Price🛈 Info

MAP Price Explanation
  
Many appliance manufacturers mandate retailers to list product prices at minimum advertised prices (MAP Price). 


CAS sales staff have the ability to significantly discount most product prices below our online advertised prices especially when purchasing multiple products.
 
Visit one of our many Canadian showrooms or call 877-374-3439 to speak with our knowledgeable sales staff to get the best prices on your appliances
$3,999
 Add to Cart
Call Local Showroom
BGCPF30
BGCPF30
Product Accessories
$399
TPKCPF30
TPKCPF30
Product Accessories
$399
Similar Colours and Options
CPF30UGGWH
Not Available For Sale
CPF30UGMAN
Not Available For Sale
CPF30UGMBL
Not Available For Sale
2KN87V
Region Availability:
Contact Us
When will I get this?
 
Reserve & Pick Up
FREE
Distribution Centres
Address
Units Available
Woodbridge, ON
27 Director Crt.
Winnipeg, MB
191 Elan Blvd
Burnaby, BC
8010 Winston St.
Ottawa, ON
55 Banton St.
Laval, QC
1340 Boul. Dagenais Ouest
Dartmouth, NS
315 Wilkinson Ave.
Calgary, AB
2777 23 Ave. NE

Protect your purchase with an extended warranty.

Protect purchase for 2 years: $129.99 CAD
Protect purchase for 3 years: $199.99 CAD

Description & Features

Smeg CPF30UGMWH Dual Fuel Range, 30 inch Exterior Width, Convection, 4 Burners, 3.6 cu. ft. Capacity, Storage Drawer, 1 Ovens, White colour

CPF30UGMWH

New

Portofino Aesthetic

EAN13: 8017709256685

Portofino Pro-Style Dual Fuel Range, White, 30” x 25”


PORTOFINO STYLE

Stainless steel control knobs

Soft close oven door

Full-width continuous grates

Storage compartment

MULTIFUNCTION ELECTRIC OVEN:

10 cooking modes including Pizza Function

Programmable timer with touch display

Adjustable thermostat 120° - 500°F

Air-cooled triple-glazed removable door

True European convection

Oven capacity: 3.6 cu. ft.

Ever Clean enameled interior cavity

4 shelf positions

2 x halogen oven lights

Bake element 1.7kW

Broil element 2.9kW

Convection element 2.7Kw

GAS RANGETOP:

4 gas burners

Diamond con guration burner layout

Center-rear 4500 BTUs

Center-front 8000 BTUs

Right super burner 20000 BTUs

Left double-inset super burner 20000 BTUs

Heavy-duty cast iron grates

Automatic electric ignition

LP gas conversion kit included

SAFETY:

Gas safety valves

Air-cooled door to prevent overheating

Connected load nominal power: 240/120V - 17 Amps

Voltage rating: 240/120V 60Hz

ACCESSORIES INCLUDED:

1 wok ring

1 deep oven tray

1 partial-extraction telescopic guide

2 chrome shelves

1 black toe kick


Manufacturer's Warranty: 2 years

EAN: 8017709256685

Specs

Type
Product family Range
Range size 30"
Range fuel Dual-fuel
N. of ovens 1
Main oven Thermo-ventilated
EAN code 8017709256685
Aesthetic
Color White
Aesthetics Portofino
Design Flush mounted
Material Painted metal
Door With frame
Control panel finish Metal enameled
Cooktop color Stainless steel
Handle Portofino
Controls color Stainless steel
Upstand Yes
Display Touch
Grates Cast Iron
Door glass type Gray
Handle color Colored
Control knobs Portofino
No. of controls 7
Feet Stainless steel
Plinth Black
Storage compartment Storage drawer
Main oven options
Timer Yes
End-of-cooking alarm Yes
Minimum Temperature 120 °F
Maximum temperature 500 °F
Cooktop technical features
Cooking zones 4
Zone 1 - Type Gas - Dual ultra-rapid
Zone 2 - Type Gas - Semi-rapid
Zone 3 - Type AUX
Zone 4 - Type Gas - Ultra-rapid
Zone 1 - Power 5.86 kW
Zone 1 - Power 20000 BTU
Zone 2 - Power 2.34 kW
Zone 2 - Power 8000 BTU
Zone 3 - Power 1.31 kW
Zone 3 - Power 4500 BTU
Zone 4 - Power 5.86 kW
Zone 4 - Power 20000 BTU
Burners type Standard
Burner caps Enameled matte black
Automatic gas ignition Yes
Gas safety valves Yes
Main Oven Technical Features
Volume 0.13 cu. ft.
Cavity material EverClean enamel
No. of shelves 4
Shelves type Metal racks
No. of lights 2
Light type Halogen
Light Power 40 W
Fan number 1
Time setting Start and end
Door opening Drop-down
Light on when door is open Yes
Removable door Yes
Full-glass inner door Yes
Removable inner door Yes
Total no. of door glasses 3
No.of thermo-reflective door glasses 2
Safety thermostat Yes
Cooling system Tangential
Grill type Electric
Grill power 1700 W
Large grill - Power 2900 W
Bottom heating element - Power 1700 W
Upper heating element - Power 1200 W
Circular heating element - Power 2700 W
Soft Close system Yes
Temperature control Electro-mechanical
Electrical Connection
Electrical connection rating 3700 W
Current 20 A
Circuit breaker 20 A
Voltage 240/208 V
Frequency 60 Hz
Power cord length 47 1/4 "
Type of electric cable installed Yes, Double phase
Gas Connection
Gas Type G20/G25 - 20/25 mbar
Logistic Information
Dimensions 915x762x635 mm
Width 30 1/16 "
Height 36 1/16 "
Depth 25 1/16 "
Packaged dimensions 1010X870X750 mm
Gross weight 259 lbs
Net weight 231 lbs
Packaged width 34 1/4 "
Packaged depth 29 1/2 "
Packaged height 39 3/4 "
Maximum stackability 4
Packaging Cardboard box
Packaging composition - Paper 10 lbs
Packaging composition - Polystyrene 12 lbs
Packaging composition - Wood 5 lbs
Packaging composition - Plastics 1 lbs
Accessories Included
Other gas nozzles included G30 LPG liquid gas
Accessories included for main oven and cooktop
Cast iron wok support 1
Wide baking tray 1
Oven grid with back-stop, tray support 1
TOP Oven grid with back stop 1
Grill mesh 1
0.8"-deep tray 1
Telescopic Guide rails, partial Extraction 1

Options

  • BGCPF30 - Grill Plate
  • GT91P - 1-Level Telescopic Shelf – Partial Extraction
  • PPR9 - Pizza Stone
  • TPKCPF30 - Teppanyaki Grill Plate

Versions

  • CPF30UGMR - Red
  • CPF30UGMX - Stainless Steel
  • CPF30UGMYW - Yellow
  • CPF30UGMOR - Orange
  • CPF30UGMBL - Black
  • CPF30UGMOG - Olive Green
  • CPF30UGMAN - Matte black

Manuals

Smeg Range 2024 Line Up Smeg Range 2024 Line Up

Video

Reviews

Rebates
Warranty
Financing
Install
Basic installation and delivery services are available from CAS
Click here for more details.

Advanced Installation Services (After Delivery)
Offered by Quick Contractors®
CAS Suggested Installation Provider
 1-877-694-3909
To book service online please visit quicktask.com/cas

SELECT CATEGORY FOR A LIST OF AVAILABLE INSTALLATION SERVICES

Refrigerator

Refrigerator Installation Service (New Waterline) by Quick Contractors

Things to note:

  • This service should be purchased if an entirely new waterline is required.
  • If this is replacing your existing refrigerator, our delivery team will uncrate and move your new purchase into place. They will not plug it in.
  • If there is open floor access, 60 feet of waterline will be included in the installation.
  • The Quick Contractors installer will NOT remove packaging or provide haul away services.
  • Refrigerator door reversal service can be added for an extra cost. Please contact your local store for details.

For a full list of requirements or further assistance please call 1-877-694-3909 or visit quicktask.com/cas

Gas Range

Gas Range Installation Service with New Flexible Hose by Quick Contractors

Things to note:

  • This package does NOT include removal of any packaging.
  • This service does NOT include haul away.
  • Extra charges will apply if shut-off valves, gas permits or any custom carpentry work is needed to allow the new appliance to fit.
  • If a completely new installation is required please call 1-877-694-3909 or visit quicktask.com/cas to arrange for an on-site quotation. Once the on-site inspection is completed, a Quick Contractors installer will provide a detailed quotation of the work required and the associated cost. The quote includes all necessary plumbing, electrical, and any other trades and permits required to facilitate the completion of the new installation. All fees for an on-site inspection are non-refundable and must be paid for at your local CAS showroom.

For a full list of requirements or further assistance please call 1-877-694-3909 or visit quicktask.com/cas

WASHER & DRYER

Gas Dryer Installation Service with New Flexible Hose by Quick Contractors

Things to note:

  • This service should be purchased if there was an existing gas dryer in place before.
  • If a completely new installation is required please call 1-877-694-3909 or visit quicktask.com/cas to arrange for an on-site quotation. Once the on-site inspection is completed, a Quick Contractors installer will provide a detailed quotation of the work required and the associated cost. The quote includes all necessary plumbing, electrical, and any other trades and permits required to facilitate the completion of the new installation. All fees for an on-site inspection are non-refundable and must be paid for at your local CAS showroom.
  • The Quick Contractors installer will NOT remove packaging or provide haul away services.
  • Extra charges will apply if any shut-off valves, gas permits, vent-less exhaust kits, conversion kits, vent hose, stacking of items, expansion and reduction adapters, or custom carpentry work is needed to allow the new appliance to fit.


White Glove Dryer (Electric only!) Installation

Things to note:

  • Delivery person will complete this at the time of delivery.
  • Additional charges will apply at point of purchase.



White Glove Washing Machine Installation

Things to note:

  • Delivery person will complete this at the time of delivery.
  • Additional charges will apply at point of purchase.

For a full list of requirements or further assistance please call 1-877-694-3909 or visit quicktask.com/cas

Dishwasher

Dishwasher with Hose Installation and Haul Away Service

Things to note:

  • Delivery person will pick-up and deliver the unit and remove its packaging.
  • This is a basic installation into an existing outlet.
  • A 6 feet stainless steel braided fill hose (supply line) is included with this installation service.
  • Delivery person will haul away the old unit and dispose of all packing and materials.
  • Extra charges will apply if any risers, air gaps, pigtails, elbows, on/off switches, working in crawl spaces, or custom carpentry work is needed to remove old unit.
  • If a completely new installation is required please call 1-877-694-3909 or visit quicktask.com/cas to arrange for an on-site quotation. Once the on-site inspection is completed, a Quick Contractors installer will provide a detailed quotation of the work required and the associated cost. The quote includes all necessary plumbing, electrical, and any other trades and permits required to facilitate the completion of the new installation. All fees for an on-site inspection are non-refundable and must be paid for at your local CAS showroom.


Dishwasher with Hose Installation Service

Things to note:

  • This is a basic installation into an existing outlet.
  • You must remove the packaging prior to the installation.
  • Your unit should be placed near the intended installation site in advance of the Quick Contractor installer's arrival, unless appliance delivery has been purchased.
  • Please disconnect your existing unit.
  • A 6 feet stainless steel braided fill hose (supply line) is included with this installation service.
  • Extra charges will apply if any risers, air gaps, pigtails, elbows, on/off switches, working in crawl spaces, or custom carpentry work is needed to remove the old unit.
  • If a completely new installation is required please call 1-877-694-3909 or visit quicktask.com/cas to arrange for an on-site quotation. Once the on-site inspection is completed, a Quick Contractors installer will provide a detailed quotation of the work required and the associated cost. The quote includes all necessary plumbing, electrical, and any other trades and permits required to facilitate the completion of the new installation. All fees for an on-site inspection are non-refundable and must be paid for at your local CAS showroom.

For a full list of requirements or further assistance please call 1-877-694-3909 or visit quicktask.com/cas

Range Hood

Range Hood (Ductless) Installation by Quick Contractors

Things to note:

  • This service does NOT include haul away and/or disposal of packaging.
  • If a completely new installation is required please call 1-877-694-3909 or visit quicktask.com/cas to arrange for an on-site quotation. Once the on-site inspection is completed, a Quick Contractors installer will provide a detailed quotation of the work required and the associated cost. The quote includes all necessary plumbing, electrical, and any other trades and permits required to facilitate the completion of the new installation. All fees for an on-site inspection are non-refundable and must be paid for at your local CAS showroom.


Range Hood (Ducted) Installation by Quick Contractors

Things to note:

  • This service does NOT include haul away and/or disposal of packaging.
  • If a completely new installation is required please call 1-877-694-3909 or visit quicktask.com/cas to arrange for an on-site quotation. Once the on-site inspection is completed, a Quick Contractors installer will provide a detailed quotation of the work required and the associated cost. The quote includes all necessary plumbing, electrical, and any other trades and permits required to facilitate the completion of the new installation. All fees for an on-site inspection are non-refundable and must be paid for at your local CAS showroom.


Vent Hood or Island Canopy Installation by Quick Contractors

Things to note:

  • This package does NOT include moving the existing duct work, or any drywall patching or painting.
  • This service does NOT include haul away and/or disposal of packaging.
  • If a completely new installation is required please call 1-877-694-3909 or visit quicktask.com/cas to arrange for an on-site quotation. Once the on-site inspection is completed, a Quick Contractors installer will provide a detailed quotation of the work required and the associated cost. The quote includes all necessary plumbing, electrical, and any other trades and permits required to facilitate the completion of the new installation. All fees for an on-site inspection are non-refundable and must be paid for at your local CAS showroom.

For a full list of requirements or further assistance please call 1-877-694-3909 or visit quicktask.com/cas

OTR – Microwave

The Quick Contractors Installer will:

  • Remove packaging from unit and inspect prior to installation
  • Disconnect electrical service to existing OTR
  • Disconnect Duct
  • Mount, center (if possible) and secure support bracket for new OTR as required by manufacturer’s specifics
  • Check and rotate, if necessary, exhaust fan, as required for excising ventilation
  • Connect and seal to existing duct, if necessary
  • Plug OTR cord into receptacle and secure with hardware provided
  • Install all accessory filters, covers, panels and/or racks
  • Test OTR by activating and monitoring a heating cell (using container filled with water), the exhaust fan and all lights and remaining accessories
  • If OTR is mounted using ductless application, installer will ensure accessory charcoal filter is properly installed


Note: All associated packaging of the unit that was installed will be broken down and placed in storage location OR outside as required


Common Overages:

  • Dedicated 110-volt electrical line
  • Changing a round vent to a rectangular vent OR vice versa
  • Installing an electrical receptacle box if improper service was sold
  • Additional duct work to allow transition from eternal exhaust to recirculating OR vise versa
  • Carpentry work to allow new OTR to fit


For a full list of requirements or further assistance please call 1-877-694-3909 or visit quicktask.com/cas

Electric Cooktop

The Quick Contractors Installer will:

  • Remove packaging from unit and inspect prior to installation
  • Set cooktop into opening
  • Extend leveling brackets to floor of cabinet so cooktop sits straight
  • Secure the cooktop to the countertop
  • Screw leveling brackets to bottom of cabinet
  • Run appropriate power cable into cabinet
  • Connect cooktop to electrical box and receptacle
  • Plug cooktop power cord into outlet
  • Test Cooktop by activating and monitoring all surface burner elements, all controls, accessories (Clock, timer, setting, etc.)


Note: All associated packaging of the unit that was installed will be broken down and placed in storage location OR outside as required


Common Overages:

  • Carpentry work to allow the new appliance to fit

For a full list of requirements or further assistance please call 1-877-694-3909 or visit quicktask.com/cas

Gas Cooktop

The Quick Contractors Installer will:

  • Remove packaging from unit and inspect prior to installation
  • Terminate gas service from shut-off valve, verify gas is turned off at shut-off valve and then disconnect gas from appliance. If no shut off valve is present, additional charges can be applied to terminate gas service and install shut-off valve, but not to exceed authorized additional charge estimate provided to customer
  • Secure the Cooktop to the countertop
  • Screw leveling brackets to bottom of cabinet
  • Extend leveling brackets to floor of cabinet so cooktop sits straight
  • Connect cooktop to electrical box and receptacle and plug cooktop power cord into outlet
  • Run appropriate power cable into cabinet
  • Ensure line is capped and there are no leaks
  • Connect gas service and ventilation to new gas appliance
  • Turn gas service back on and test all connections for leaks
  • Monitor gas service and ensure there are no leaks
  • Ensure all accessories; (grease, pants, racks, burner faps, lint filter, etc.) are installed on appliance
  • Test gas appliance by activating and monitoring all surface burner elements, all controls, accessories (Clock, timer, setting, etc.), all ventilation connections (Check exterior wall cap for debris), Ensure all burner elements are adjusted according to display proper flame characteristics
  • Includes new mandatory flex hose required by code


Note: All associated packaging of the unit that was installed will be broken down and placed in storage location OR outside as required


Common Overages:

  • Shut off valve
  • Conversion kits
  • Custom carpentry work to allow the new appliance to fit

For a full list of requirements or further assistance please call 1-877-694-3909 or visit quicktask.com/cas

Wall Oven Single

The Quick Contractors Installer will:

  • A two-person team will install single wall ovens
  • Terminate electrical service for electric oven and disconnect from appliance
  • Ensure electrical cord has been unplugged to prevent damage to receptacle
  • Connect electrical service to new electric oven
  • Ensure all accessories (grates, pants, racks, burns caps, etc.) are installed on appliance
  • Test wall oven by activating and monitoring all surface burner elements, broiler, oven OR interior heating elements, all controls, accessories (clock, timer, setting, etc.), oven door, storage drawer, and ensure all burner elements are adjusted accordingly


Note: All associated packaging of the unit that was installed will be broken down and placed in storage location OR outside as required


Common Overages:

  • Shelf build-up when new unit is shorter than old
  • Converting from gas to electric OR vise versa (may require electrician and/ or local gas provider)
  • Customer carpentry work to allow new appliance to fit

For a full list of requirements or further assistance please call 1-877-694-3909 or visit quicktask.com/cas

BBQ Assembly in Home

The Quick Contractors Installer will:

  • Un-package and inspect the unit to ensure there are no missing or damaged pieces
  • Assembly of the BBQ
  • Installation of any accessories such as the ignitor, side burner, etc.
  • Review installation and proper operation with customer upon completion
  • Final clean up of job site


Note: All associated packaging of the unit that was installed will be broken down and placed in storage location OR outside as required

For a full list of requirements or further assistance please call 1-877-694-3909 or visit quicktask.com/cas

ADDITIONAL SERVICES


If you do not see the service you require, please reach out to us. There are a wide arrangement of services available that may not be listed.


For a full list of requirements or further assistance please call 1-877-694-3909 or visit quicktask.com/cas
Delivery