For Lower Prices Than Online - Visit In Store, Call or Chat*
BUNDLE & SAVE UP TO 35% OFF* - Call, Chat + In Store Only
Buy any Whirlpool or Maytag laundry set and claim a one year supply of Swash laundry detergent
4.4 1767
Whirlpool WTW4957PW
2KZ5T6
Call Now! 877-374-3439 Or Chat For Bundle Discounts
Call Now! 877-374-3439 Or Chat For Bundle Discounts
MAP Price🛈 Info

MAP Price Explanation
  
Many appliance manufacturers mandate retailers to list product prices at minimum advertised prices (MAP Price). 


CAS sales staff have the ability to significantly discount most product prices below our online advertised prices especially when purchasing multiple products.
 
Visit one of our many Canadian showrooms or call 877-374-3439 to speak with our knowledgeable sales staff to get the best prices on your appliances
















Excludes: Whirlpool, Maytag, kitchenAid, Jennair brands
$797
MIX & MATCH!
NOW FOR A LIMITED TIME, buy 2 or more eligible major kitchen/laundry appliances from separate categories and save instantly!*
BUY 2 ITEMS, GET $150 OFF!
BUY 3 ITEMS, GET $400 OFF!
BUY 4 ITEMS, GET $650 OFF!
BUY 5 ITEMS, GET $800 OFF!
BUY 6 OR MORE ITEMS, GET $1,000 OFF!

Automatically applied during checkout or call 1-877-374-3439 to redeem this offer today! Show terms.
 Add to Cart
Call Local Showroom
Ratings & Reviews
4.4
87%
recommend this
Read Reviews
(1767 reviews)
YWED4815EW
YWED4815EW
Electric Dryer
$698
2KZ5T6
Region Availability:
In Stock
When will I get this?
 
Reserve & Pick Up Tuesday, October 15 or later
FREE

Protect your purchase with an extended warranty.

Protect purchase for 2 years: $79.99 CAD
Protect purchase for 3 years: $129.99 CAD
In stock. Click here to see showrooms with this item on display to order.
  • Winnipeg North
  • Ottawa West
  • Windsor
  • Edmonton
  • Toronto
  • Montréal
  • Surrey

Description & Features

Whirlpool WTW4957PW Top Load Washer, 28 inch Width, Agitator, 4.5 cu. ft. Capacity, 12 Wash Cycles, 680 RPM Washer Spin Speed, White colour 2-in-1 Removable Agitator

Introducing the Whirlpool WTW4957PW Top Load Washer – your trusted companion for powerful and efficient laundry cleaning. With its robust construction, spacious capacity, and versatile features, this washer is designed to handle your toughest laundry challenges while providing convenience and reliability.

Measuring at a convenient 28-inch width, the Whirlpool WTW4957PW Top Load Washer offers a spacious 4.5 cubic feet capacity, providing plenty of room for large loads and bulky items. Whether you're washing bedding, towels, or everyday garments, this washer has the capacity to handle it all with ease.

Equipped with an agitator and a 680 RPM washer spin speed, this washer delivers powerful cleaning action that penetrates deep into fabrics to remove dirt and stains effectively. The 2-in-1 removable agitator allows for versatile cleaning options, giving you the flexibility to customize your wash cycle to suit your specific needs.

With 12 wash cycles to choose from, including Normal, Heavy Duty, Delicates, and more, you can select the perfect cycle for every type of fabric and soil level, ensuring optimal cleaning results every time. Plus, with its white color and sleek design, this washer adds a touch of elegance to your laundry room, enhancing the overall aesthetic of your space.

In summary, the Whirlpool WTW4957PW Top Load Washer combines durability, performance, and convenience to deliver exceptional cleaning results that you can count on. With its spacious capacity, versatile features, and reliable construction, this washer is sure to become an essential part of your laundry routine, making chores easier and more efficient than ever before.

 
 
 
 



Choose how you wash in this 4.4-4.5 cu. ft. Whirlpool® Top Load Washer with the 2 in 1 Removable Agitator. Easily swap the agitator in or out to care for clothes the way you want and get twice the washer you have at home. Choose the right amount of agitation for your fabrics with Soil Level Selection and get the water level you need for the cycle you want with Water Level Selection. Soak and wash in one cycle with Soaking Cycles and prevent fabrics from snagging with the Smooth Spiral Stainless Steel Wash Basket.

2 in 1 Removable Agitator
2 in 1 Removable Agitator
The 2 in 1 Removable Agitator lets you choose how you wash and care for your clothes by easily swapping the agitator post in or out. With two ways to wash, it's twice the washer you have at home.
Soil Level Selection
Soil Level Selection
Choose the right amount of agitation for your fabrics with an option that lets you select the soil level of your load on any cycle, so you get less agitation on light loads and more on full or dirty loads.
Soaking Cycles
Soaking Cycles
Soak and wash in one cycle. Skip a trip to the laundry room with Soaking Cycles that start washing whites and colors as soon as they're done soaking.
Smooth Spiral Stainless Steel Wash Basket
Smooth Spiral Stainless Steel Wash Basket
Help protect fabrics with this stainless steel wash basket that gently guides clothes during the wash.

  • Water Level Selection
  • Choose the water level you need for the cycle you want. No matter which wash cycle you choose, Water Level Selection lets you select Auto Sensing to adjust water based on load size or the Deep Water Wash Option to help break down loose soils with more water.
  • Whites Cycle
  • Keep your whites looking their best with a cycle that cleans thoroughly while gently caring for your clothes.
  • Colors Cycle
  • Care for colored fabrics with a cycle that uses cold water to provide optimal fabric care.
  • Delicates Cycle
  • Clean your delicate items with an intermittent wash action and slow spin speed, to provide everything you'd expect for gentle fabric care.
  • Clean Washer with affresh' Cycle
  • Run the Clean Washer with affresh' Cycle every 30 washes with an affresh' washing machine cleaner tablet or liquid chlorine bleach to thoroughly clean the inside of your washer.
  • An American Company for Over 100 Years
  • Whirlpool Corporation started in 1911 as a small company in Benton Harbor, Michigan. Today we are a global home appliance business selling products around the world. We are proud of our American heritage and ingenuity that have driven innovation for over 100 years.


Manufacturer's Warranty: 1 year

UPC: 883049676906

EAN: 0883049676906

Specs

Certifications
CUL Yes
IMEF 1-16/25
IWF 5-19/20
Dimensions
Depth 68.58 cm, 27.0000 in
Height 111.76 cm, 44.0000 in
Height To Top Of Cabinet 111.76 cm, 44.0000 in
Width 69.85 cm, 27.5000 in
Details
Advanced Vibration Control™ Yes
Eco Monitor/Efficiency Monitor No
Internal Heater No
Maximum Spin Speed 680
Out of Balance Sensing Yes
Wash Action 2 in 1 Removable Agitator
Water Factor 5-19/20
Exterior
Adjustable Feet Yes
Lid/Door Lock Yes
Controls
Automatic Temperature Controls Yes
LCD Touch Screen No
Cycles
Number of Wash Cycles 12
Options
Number of Washer Options 4
Modifiers
Delay Start No
Number of Rinse Options 4
Number of Soil Levels 4
Number of Wash/Rinse Temperatures 5
Number of Water Levels 2
Features
Fabric Brush No
Recirculation No
Stackable No
Water Faucet No
Electrical
Watts 120

Manuals

Video

Reviews

Rebates
Warranty
Financing
Install
Basic installation and delivery services are available from CAS
Click here for more details.

Advanced Installation Services (After Delivery)
Offered by Quick Contractors®
CAS Suggested Installation Provider
 1-877-694-3909
To book service online please visit quicktask.com/cas

SELECT CATEGORY FOR A LIST OF AVAILABLE INSTALLATION SERVICES

Refrigerator

Refrigerator Installation Service (New Waterline) by Quick Contractors

Things to note:

  • This service should be purchased if an entirely new waterline is required.
  • If this is replacing your existing refrigerator, our delivery team will uncrate and move your new purchase into place. They will not plug it in.
  • If there is open floor access, 60 feet of waterline will be included in the installation.
  • The Quick Contractors installer will NOT remove packaging or provide haul away services.
  • Refrigerator door reversal service can be added for an extra cost. Please contact your local store for details.

For a full list of requirements or further assistance please call 1-877-694-3909 or visit quicktask.com/cas

Gas Range

Gas Range Installation Service with New Flexible Hose by Quick Contractors

Things to note:

  • This package does NOT include removal of any packaging.
  • This service does NOT include haul away.
  • Extra charges will apply if shut-off valves, gas permits or any custom carpentry work is needed to allow the new appliance to fit.
  • If a completely new installation is required please call 1-877-694-3909 or visit quicktask.com/cas to arrange for an on-site quotation. Once the on-site inspection is completed, a Quick Contractors installer will provide a detailed quotation of the work required and the associated cost. The quote includes all necessary plumbing, electrical, and any other trades and permits required to facilitate the completion of the new installation. All fees for an on-site inspection are non-refundable and must be paid for at your local CAS showroom.

For a full list of requirements or further assistance please call 1-877-694-3909 or visit quicktask.com/cas

WASHER & DRYER

Gas Dryer Installation Service with New Flexible Hose by Quick Contractors

Things to note:

  • This service should be purchased if there was an existing gas dryer in place before.
  • If a completely new installation is required please call 1-877-694-3909 or visit quicktask.com/cas to arrange for an on-site quotation. Once the on-site inspection is completed, a Quick Contractors installer will provide a detailed quotation of the work required and the associated cost. The quote includes all necessary plumbing, electrical, and any other trades and permits required to facilitate the completion of the new installation. All fees for an on-site inspection are non-refundable and must be paid for at your local CAS showroom.
  • The Quick Contractors installer will NOT remove packaging or provide haul away services.
  • Extra charges will apply if any shut-off valves, gas permits, vent-less exhaust kits, conversion kits, vent hose, stacking of items, expansion and reduction adapters, or custom carpentry work is needed to allow the new appliance to fit.


White Glove Dryer (Electric only!) Installation

Things to note:

  • Delivery person will complete this at the time of delivery.
  • Additional charges will apply at point of purchase.



White Glove Washing Machine Installation

Things to note:

  • Delivery person will complete this at the time of delivery.
  • Additional charges will apply at point of purchase.

For a full list of requirements or further assistance please call 1-877-694-3909 or visit quicktask.com/cas

Dishwasher

Dishwasher with Hose Installation and Haul Away Service

Things to note:

  • Delivery person will pick-up and deliver the unit and remove its packaging.
  • This is a basic installation into an existing outlet.
  • A 6 feet stainless steel braided fill hose (supply line) is included with this installation service.
  • Delivery person will haul away the old unit and dispose of all packing and materials.
  • Extra charges will apply if any risers, air gaps, pigtails, elbows, on/off switches, working in crawl spaces, or custom carpentry work is needed to remove old unit.
  • If a completely new installation is required please call 1-877-694-3909 or visit quicktask.com/cas to arrange for an on-site quotation. Once the on-site inspection is completed, a Quick Contractors installer will provide a detailed quotation of the work required and the associated cost. The quote includes all necessary plumbing, electrical, and any other trades and permits required to facilitate the completion of the new installation. All fees for an on-site inspection are non-refundable and must be paid for at your local CAS showroom.


Dishwasher with Hose Installation Service

Things to note:

  • This is a basic installation into an existing outlet.
  • You must remove the packaging prior to the installation.
  • Your unit should be placed near the intended installation site in advance of the Quick Contractor installer's arrival, unless appliance delivery has been purchased.
  • Please disconnect your existing unit.
  • A 6 feet stainless steel braided fill hose (supply line) is included with this installation service.
  • Extra charges will apply if any risers, air gaps, pigtails, elbows, on/off switches, working in crawl spaces, or custom carpentry work is needed to remove the old unit.
  • If a completely new installation is required please call 1-877-694-3909 or visit quicktask.com/cas to arrange for an on-site quotation. Once the on-site inspection is completed, a Quick Contractors installer will provide a detailed quotation of the work required and the associated cost. The quote includes all necessary plumbing, electrical, and any other trades and permits required to facilitate the completion of the new installation. All fees for an on-site inspection are non-refundable and must be paid for at your local CAS showroom.

For a full list of requirements or further assistance please call 1-877-694-3909 or visit quicktask.com/cas

Range Hood

Range Hood (Ductless) Installation by Quick Contractors

Things to note:

  • This service does NOT include haul away and/or disposal of packaging.
  • If a completely new installation is required please call 1-877-694-3909 or visit quicktask.com/cas to arrange for an on-site quotation. Once the on-site inspection is completed, a Quick Contractors installer will provide a detailed quotation of the work required and the associated cost. The quote includes all necessary plumbing, electrical, and any other trades and permits required to facilitate the completion of the new installation. All fees for an on-site inspection are non-refundable and must be paid for at your local CAS showroom.


Range Hood (Ducted) Installation by Quick Contractors

Things to note:

  • This service does NOT include haul away and/or disposal of packaging.
  • If a completely new installation is required please call 1-877-694-3909 or visit quicktask.com/cas to arrange for an on-site quotation. Once the on-site inspection is completed, a Quick Contractors installer will provide a detailed quotation of the work required and the associated cost. The quote includes all necessary plumbing, electrical, and any other trades and permits required to facilitate the completion of the new installation. All fees for an on-site inspection are non-refundable and must be paid for at your local CAS showroom.


Vent Hood or Island Canopy Installation by Quick Contractors

Things to note:

  • This package does NOT include moving the existing duct work, or any drywall patching or painting.
  • This service does NOT include haul away and/or disposal of packaging.
  • If a completely new installation is required please call 1-877-694-3909 or visit quicktask.com/cas to arrange for an on-site quotation. Once the on-site inspection is completed, a Quick Contractors installer will provide a detailed quotation of the work required and the associated cost. The quote includes all necessary plumbing, electrical, and any other trades and permits required to facilitate the completion of the new installation. All fees for an on-site inspection are non-refundable and must be paid for at your local CAS showroom.

For a full list of requirements or further assistance please call 1-877-694-3909 or visit quicktask.com/cas

OTR – Microwave

The Quick Contractors Installer will:

  • Remove packaging from unit and inspect prior to installation
  • Disconnect electrical service to existing OTR
  • Disconnect Duct
  • Mount, center (if possible) and secure support bracket for new OTR as required by manufacturer’s specifics
  • Check and rotate, if necessary, exhaust fan, as required for excising ventilation
  • Connect and seal to existing duct, if necessary
  • Plug OTR cord into receptacle and secure with hardware provided
  • Install all accessory filters, covers, panels and/or racks
  • Test OTR by activating and monitoring a heating cell (using container filled with water), the exhaust fan and all lights and remaining accessories
  • If OTR is mounted using ductless application, installer will ensure accessory charcoal filter is properly installed


Note: All associated packaging of the unit that was installed will be broken down and placed in storage location OR outside as required


Common Overages:

  • Dedicated 110-volt electrical line
  • Changing a round vent to a rectangular vent OR vice versa
  • Installing an electrical receptacle box if improper service was sold
  • Additional duct work to allow transition from eternal exhaust to recirculating OR vise versa
  • Carpentry work to allow new OTR to fit


For a full list of requirements or further assistance please call 1-877-694-3909 or visit quicktask.com/cas

Electric Cooktop

The Quick Contractors Installer will:

  • Remove packaging from unit and inspect prior to installation
  • Set cooktop into opening
  • Extend leveling brackets to floor of cabinet so cooktop sits straight
  • Secure the cooktop to the countertop
  • Screw leveling brackets to bottom of cabinet
  • Run appropriate power cable into cabinet
  • Connect cooktop to electrical box and receptacle
  • Plug cooktop power cord into outlet
  • Test Cooktop by activating and monitoring all surface burner elements, all controls, accessories (Clock, timer, setting, etc.)


Note: All associated packaging of the unit that was installed will be broken down and placed in storage location OR outside as required


Common Overages:

  • Carpentry work to allow the new appliance to fit

For a full list of requirements or further assistance please call 1-877-694-3909 or visit quicktask.com/cas

Gas Cooktop

The Quick Contractors Installer will:

  • Remove packaging from unit and inspect prior to installation
  • Terminate gas service from shut-off valve, verify gas is turned off at shut-off valve and then disconnect gas from appliance. If no shut off valve is present, additional charges can be applied to terminate gas service and install shut-off valve, but not to exceed authorized additional charge estimate provided to customer
  • Secure the Cooktop to the countertop
  • Screw leveling brackets to bottom of cabinet
  • Extend leveling brackets to floor of cabinet so cooktop sits straight
  • Connect cooktop to electrical box and receptacle and plug cooktop power cord into outlet
  • Run appropriate power cable into cabinet
  • Ensure line is capped and there are no leaks
  • Connect gas service and ventilation to new gas appliance
  • Turn gas service back on and test all connections for leaks
  • Monitor gas service and ensure there are no leaks
  • Ensure all accessories; (grease, pants, racks, burner faps, lint filter, etc.) are installed on appliance
  • Test gas appliance by activating and monitoring all surface burner elements, all controls, accessories (Clock, timer, setting, etc.), all ventilation connections (Check exterior wall cap for debris), Ensure all burner elements are adjusted according to display proper flame characteristics
  • Includes new mandatory flex hose required by code


Note: All associated packaging of the unit that was installed will be broken down and placed in storage location OR outside as required


Common Overages:

  • Shut off valve
  • Conversion kits
  • Custom carpentry work to allow the new appliance to fit

For a full list of requirements or further assistance please call 1-877-694-3909 or visit quicktask.com/cas

Wall Oven Single

The Quick Contractors Installer will:

  • A two-person team will install single wall ovens
  • Terminate electrical service for electric oven and disconnect from appliance
  • Ensure electrical cord has been unplugged to prevent damage to receptacle
  • Connect electrical service to new electric oven
  • Ensure all accessories (grates, pants, racks, burns caps, etc.) are installed on appliance
  • Test wall oven by activating and monitoring all surface burner elements, broiler, oven OR interior heating elements, all controls, accessories (clock, timer, setting, etc.), oven door, storage drawer, and ensure all burner elements are adjusted accordingly


Note: All associated packaging of the unit that was installed will be broken down and placed in storage location OR outside as required


Common Overages:

  • Shelf build-up when new unit is shorter than old
  • Converting from gas to electric OR vise versa (may require electrician and/ or local gas provider)
  • Customer carpentry work to allow new appliance to fit

For a full list of requirements or further assistance please call 1-877-694-3909 or visit quicktask.com/cas

BBQ Assembly in Home

The Quick Contractors Installer will:

  • Un-package and inspect the unit to ensure there are no missing or damaged pieces
  • Assembly of the BBQ
  • Installation of any accessories such as the ignitor, side burner, etc.
  • Review installation and proper operation with customer upon completion
  • Final clean up of job site


Note: All associated packaging of the unit that was installed will be broken down and placed in storage location OR outside as required

For a full list of requirements or further assistance please call 1-877-694-3909 or visit quicktask.com/cas

ADDITIONAL SERVICES


If you do not see the service you require, please reach out to us. There are a wide arrangement of services available that may not be listed.


For a full list of requirements or further assistance please call 1-877-694-3909 or visit quicktask.com/cas
Delivery
13AC794 13CS794 13DF794 13TA794 13DX795 13HD795 13795 13RO795 13TT795 13BR795 13FU798 13LE798