For Lower Prices Than Online - Visit In Store, Call or Chat*
BUNDLE & SAVE UP TO 35% OFF* - Call, Chat + In Store Only
LG Save $300 buy Eligible WashTower+ Styler!!!
LG Studio Kitchen + Laundry BUY 2 $400 Off, BUY 3+ $800 off!!!
3.7 20
LG WD300CW
LG Laundry 2024 LG Laundry 2024
2KZ7M3
Call, Chat Or Visit For Bundle Discounts
Call, Chat Or Visit For Bundle Discounts
Online MAP Price🛈 Info

MAP Price Explanation
  
Many appliance manufacturers mandate retailers to list product prices at minimum advertised prices (MAP Price). 


CAS sales staff have the ability to significantly discount most product prices below our online advertised prices especially when purchasing multiple products.
 
Visit one of our many Canadian showrooms or call 877-374-3439 to speak with our knowledgeable sales staff to get the best prices on your appliances










Excludes: LG 
$697
 Add to Cart
Call Local Showroom
Ratings & Reviews
3.7
Read Reviews
(20 reviews)
Similar Colours and Options
WD300CV
$698.00 CAD
2KZ7M3
Region Availability:
🛈 *4-12 Business Days
When will I get this?
 
Reserve & Pick Up
FREE
Distribution Centres
Address
Units Available
Woodbridge, ON
27 Director Crt.
Winnipeg, MB
191 Elan Blvd
Burnaby, BC
8010 Winston St.
Ottawa, ON
55 Banton St.
Laval, QC
1340 Boul. Dagenais Ouest
Dartmouth, NS
315 Wilkinson Ave.
Calgary, AB
2777 23 Ave. NE

Protect your purchase with an extended warranty.

Protect purchase for 2 years: $59.99 CAD
Protect purchase for 3 years: $99.99 CAD

Description & Features

LG WD300CW Pedestal, 27 inch Width, 1.0 cu. ft. Capacity, 6 Wash Cycles, Wifi Enabled, White colour 27'' SideKick™ Pedestal Washer, SmartDiagnosis™, Control Lock
  • 1.0 cu.ft. Capacity
  • Magnetic Remote Control
  • Specialty Cycles
  • Smart Diagnosis™
  • Electronic Control Panel with Dual LED Display
  • NeveRust™ Stainless Steel Tub

Perfect Solution for Delicates and Daily Loads
The LG Pedestal Washer lets you run small loads as often as you like. You can even do several loads a day for essential items like baby wear or daily items.
Delicate Wash
LG Pedestal Washer is the perfect size for hand wash or delicate items. No need to wait you can run small loads as often as you like to stop laundry from piling up.
Slim Inverter DD
Precise Control & Reliable Durability
Slimmed down to fit the LG Pedestal, providing precise control and durability. Inverter Direct Motor comes with a standard 10-year warranty.

Smart Diagnosis™
Smart Diagnosis™ quickly troubleshoots almost any minor issue before it becomes a bigger problem.
Call, Connect, Resolve
Smart Diagnosis™ uses self-diagnosing technology that can communicate 24/7 with LG customer service over the telephone providing you with comfort and reliability.

The Mighty Mini with 1.0 cu. ft. Capacity
The Mighty Mini with 1.0 cu. ft. Capacity
Just right for cleaning smaller loads as often as you need.
Meet Your Newest Laundry Ally-LG's Ingenious SideKick® Washer
Meet Your Newest Laundry Ally-LG's Ingenious SideKick® Washer
Disguised as an everyday pedestal, this mini LG washer pairs with almost any LG front load unit so you can wash two loads at the same time. The main tub is the workhorse taking on your biggest, bulkiest family-size loads like towels and bedding, while the LG SideKick® gives delicates, hand washables and workout wear the special care they deserve. With this LG pedestal washer on your side, you can divide and conquer your laundry-and the rest of your day-like never before.

  • The Mighty Mini with 1.0 cu. ft. Capacity
  • Just right for cleaning smaller loads as often as you need.
  • Meet Your Newest Laundry Ally-LG's Ingenious SideKick® Washer
  • Disguised as an everyday pedestal, this mini LG washer pairs with almost any LG front load unit so you can wash two loads at the same time. The main tub is the workhorse taking on your biggest, bulkiest family-size loads like towels and bedding, while the LG SideKick® gives delicates, hand washables and workout wear the special care they deserve. With this LG pedestal washer on your side, you can divide and conquer your laundry-and the rest of your day-like never before.

Manufacturer's Warranty: 1 year

UPC: 195174038314

EAN: 0195174038314

Specs

Series LG
TwinWash™ Compatible Yes
Colour White (W)
Electronic Control Panel with LED Display Yes
No. of Programs 6
No. of Options 5
No. of Wash/Rinse Temps 2 (Warm, Cold)
End of Cycle Signal Yes
Auto Suds Removal Yes
Leveling Legs 4 Adjustable Legs
Motor Type Direct Drive Motor
Max RPM 700
NeveRust® Stainless Steel Drum Yes
Control Panel Plastic
Door Cover Transparent Tinted Glass
Ratings UL Listed
Type Electric
Product (WxHxD) 27" x 14 1/8" x 30 3/4" (50 1/2" with drawer open)
Weight (Product/Carton) 105 / 115 lbs
Parts and Labour 1 Year
Drum Limited Lifetime
WD300CW 195174038314

Manuals

LG Laundry 2024 LG Laundry 2024

Video

Reviews

Rebates
Warranty
Financing
Install
Basic installation and delivery services are available from CAS
Click here for more details.

Advanced Installation Services (After Delivery)
Offered by Quick Contractors®
CAS Suggested Installation Provider
 1-877-694-3909
To book service online please visit quicktask.com/cas

SELECT CATEGORY FOR A LIST OF AVAILABLE INSTALLATION SERVICES

Refrigerator

Refrigerator Installation Service (New Waterline) by Quick Contractors

Things to note:

  • This service should be purchased if an entirely new waterline is required.
  • If this is replacing your existing refrigerator, our delivery team will uncrate and move your new purchase into place. They will not plug it in.
  • If there is open floor access, 60 feet of waterline will be included in the installation.
  • The Quick Contractors installer will NOT remove packaging or provide haul away services.
  • Refrigerator door reversal service can be added for an extra cost. Please contact your local store for details.

For a full list of requirements or further assistance please call 1-877-694-3909 or visit quicktask.com/cas

Gas Range

Gas Range Installation Service with New Flexible Hose by Quick Contractors

Things to note:

  • This package does NOT include removal of any packaging.
  • This service does NOT include haul away.
  • Extra charges will apply if shut-off valves, gas permits or any custom carpentry work is needed to allow the new appliance to fit.
  • If a completely new installation is required please call 1-877-694-3909 or visit quicktask.com/cas to arrange for an on-site quotation. Once the on-site inspection is completed, a Quick Contractors installer will provide a detailed quotation of the work required and the associated cost. The quote includes all necessary plumbing, electrical, and any other trades and permits required to facilitate the completion of the new installation. All fees for an on-site inspection are non-refundable and must be paid for at your local CAS showroom.

For a full list of requirements or further assistance please call 1-877-694-3909 or visit quicktask.com/cas

WASHER & DRYER

Gas Dryer Installation Service with New Flexible Hose by Quick Contractors

Things to note:

  • This service should be purchased if there was an existing gas dryer in place before.
  • If a completely new installation is required please call 1-877-694-3909 or visit quicktask.com/cas to arrange for an on-site quotation. Once the on-site inspection is completed, a Quick Contractors installer will provide a detailed quotation of the work required and the associated cost. The quote includes all necessary plumbing, electrical, and any other trades and permits required to facilitate the completion of the new installation. All fees for an on-site inspection are non-refundable and must be paid for at your local CAS showroom.
  • The Quick Contractors installer will NOT remove packaging or provide haul away services.
  • Extra charges will apply if any shut-off valves, gas permits, vent-less exhaust kits, conversion kits, vent hose, stacking of items, expansion and reduction adapters, or custom carpentry work is needed to allow the new appliance to fit.


White Glove Dryer (Electric only!) Installation

Things to note:

  • Delivery person will complete this at the time of delivery.
  • Additional charges will apply at point of purchase.



White Glove Washing Machine Installation

Things to note:

  • Delivery person will complete this at the time of delivery.
  • Additional charges will apply at point of purchase.

For a full list of requirements or further assistance please call 1-877-694-3909 or visit quicktask.com/cas

Dishwasher

Dishwasher with Hose Installation and Haul Away Service

Things to note:

  • Delivery person will pick-up and deliver the unit and remove its packaging.
  • This is a basic installation into an existing outlet.
  • A 6 feet stainless steel braided fill hose (supply line) is included with this installation service.
  • Delivery person will haul away the old unit and dispose of all packing and materials.
  • Extra charges will apply if any risers, air gaps, pigtails, elbows, on/off switches, working in crawl spaces, or custom carpentry work is needed to remove old unit.
  • If a completely new installation is required please call 1-877-694-3909 or visit quicktask.com/cas to arrange for an on-site quotation. Once the on-site inspection is completed, a Quick Contractors installer will provide a detailed quotation of the work required and the associated cost. The quote includes all necessary plumbing, electrical, and any other trades and permits required to facilitate the completion of the new installation. All fees for an on-site inspection are non-refundable and must be paid for at your local CAS showroom.


Dishwasher with Hose Installation Service

Things to note:

  • This is a basic installation into an existing outlet.
  • You must remove the packaging prior to the installation.
  • Your unit should be placed near the intended installation site in advance of the Quick Contractor installer's arrival, unless appliance delivery has been purchased.
  • Please disconnect your existing unit.
  • A 6 feet stainless steel braided fill hose (supply line) is included with this installation service.
  • Extra charges will apply if any risers, air gaps, pigtails, elbows, on/off switches, working in crawl spaces, or custom carpentry work is needed to remove the old unit.
  • If a completely new installation is required please call 1-877-694-3909 or visit quicktask.com/cas to arrange for an on-site quotation. Once the on-site inspection is completed, a Quick Contractors installer will provide a detailed quotation of the work required and the associated cost. The quote includes all necessary plumbing, electrical, and any other trades and permits required to facilitate the completion of the new installation. All fees for an on-site inspection are non-refundable and must be paid for at your local CAS showroom.

For a full list of requirements or further assistance please call 1-877-694-3909 or visit quicktask.com/cas

Range Hood

Range Hood (Ductless) Installation by Quick Contractors

Things to note:

  • This service does NOT include haul away and/or disposal of packaging.
  • If a completely new installation is required please call 1-877-694-3909 or visit quicktask.com/cas to arrange for an on-site quotation. Once the on-site inspection is completed, a Quick Contractors installer will provide a detailed quotation of the work required and the associated cost. The quote includes all necessary plumbing, electrical, and any other trades and permits required to facilitate the completion of the new installation. All fees for an on-site inspection are non-refundable and must be paid for at your local CAS showroom.


Range Hood (Ducted) Installation by Quick Contractors

Things to note:

  • This service does NOT include haul away and/or disposal of packaging.
  • If a completely new installation is required please call 1-877-694-3909 or visit quicktask.com/cas to arrange for an on-site quotation. Once the on-site inspection is completed, a Quick Contractors installer will provide a detailed quotation of the work required and the associated cost. The quote includes all necessary plumbing, electrical, and any other trades and permits required to facilitate the completion of the new installation. All fees for an on-site inspection are non-refundable and must be paid for at your local CAS showroom.


Vent Hood or Island Canopy Installation by Quick Contractors

Things to note:

  • This package does NOT include moving the existing duct work, or any drywall patching or painting.
  • This service does NOT include haul away and/or disposal of packaging.
  • If a completely new installation is required please call 1-877-694-3909 or visit quicktask.com/cas to arrange for an on-site quotation. Once the on-site inspection is completed, a Quick Contractors installer will provide a detailed quotation of the work required and the associated cost. The quote includes all necessary plumbing, electrical, and any other trades and permits required to facilitate the completion of the new installation. All fees for an on-site inspection are non-refundable and must be paid for at your local CAS showroom.

For a full list of requirements or further assistance please call 1-877-694-3909 or visit quicktask.com/cas

OTR – Microwave

The Quick Contractors Installer will:

  • Remove packaging from unit and inspect prior to installation
  • Disconnect electrical service to existing OTR
  • Disconnect Duct
  • Mount, center (if possible) and secure support bracket for new OTR as required by manufacturer’s specifics
  • Check and rotate, if necessary, exhaust fan, as required for excising ventilation
  • Connect and seal to existing duct, if necessary
  • Plug OTR cord into receptacle and secure with hardware provided
  • Install all accessory filters, covers, panels and/or racks
  • Test OTR by activating and monitoring a heating cell (using container filled with water), the exhaust fan and all lights and remaining accessories
  • If OTR is mounted using ductless application, installer will ensure accessory charcoal filter is properly installed


Note: All associated packaging of the unit that was installed will be broken down and placed in storage location OR outside as required


Common Overages:

  • Dedicated 110-volt electrical line
  • Changing a round vent to a rectangular vent OR vice versa
  • Installing an electrical receptacle box if improper service was sold
  • Additional duct work to allow transition from eternal exhaust to recirculating OR vise versa
  • Carpentry work to allow new OTR to fit


For a full list of requirements or further assistance please call 1-877-694-3909 or visit quicktask.com/cas

Electric Cooktop

The Quick Contractors Installer will:

  • Remove packaging from unit and inspect prior to installation
  • Set cooktop into opening
  • Extend leveling brackets to floor of cabinet so cooktop sits straight
  • Secure the cooktop to the countertop
  • Screw leveling brackets to bottom of cabinet
  • Run appropriate power cable into cabinet
  • Connect cooktop to electrical box and receptacle
  • Plug cooktop power cord into outlet
  • Test Cooktop by activating and monitoring all surface burner elements, all controls, accessories (Clock, timer, setting, etc.)


Note: All associated packaging of the unit that was installed will be broken down and placed in storage location OR outside as required


Common Overages:

  • Carpentry work to allow the new appliance to fit

For a full list of requirements or further assistance please call 1-877-694-3909 or visit quicktask.com/cas

Gas Cooktop

The Quick Contractors Installer will:

  • Remove packaging from unit and inspect prior to installation
  • Terminate gas service from shut-off valve, verify gas is turned off at shut-off valve and then disconnect gas from appliance. If no shut off valve is present, additional charges can be applied to terminate gas service and install shut-off valve, but not to exceed authorized additional charge estimate provided to customer
  • Secure the Cooktop to the countertop
  • Screw leveling brackets to bottom of cabinet
  • Extend leveling brackets to floor of cabinet so cooktop sits straight
  • Connect cooktop to electrical box and receptacle and plug cooktop power cord into outlet
  • Run appropriate power cable into cabinet
  • Ensure line is capped and there are no leaks
  • Connect gas service and ventilation to new gas appliance
  • Turn gas service back on and test all connections for leaks
  • Monitor gas service and ensure there are no leaks
  • Ensure all accessories; (grease, pants, racks, burner faps, lint filter, etc.) are installed on appliance
  • Test gas appliance by activating and monitoring all surface burner elements, all controls, accessories (Clock, timer, setting, etc.), all ventilation connections (Check exterior wall cap for debris), Ensure all burner elements are adjusted according to display proper flame characteristics
  • Includes new mandatory flex hose required by code


Note: All associated packaging of the unit that was installed will be broken down and placed in storage location OR outside as required


Common Overages:

  • Shut off valve
  • Conversion kits
  • Custom carpentry work to allow the new appliance to fit

For a full list of requirements or further assistance please call 1-877-694-3909 or visit quicktask.com/cas

Wall Oven Single

The Quick Contractors Installer will:

  • A two-person team will install single wall ovens
  • Terminate electrical service for electric oven and disconnect from appliance
  • Ensure electrical cord has been unplugged to prevent damage to receptacle
  • Connect electrical service to new electric oven
  • Ensure all accessories (grates, pants, racks, burns caps, etc.) are installed on appliance
  • Test wall oven by activating and monitoring all surface burner elements, broiler, oven OR interior heating elements, all controls, accessories (clock, timer, setting, etc.), oven door, storage drawer, and ensure all burner elements are adjusted accordingly


Note: All associated packaging of the unit that was installed will be broken down and placed in storage location OR outside as required


Common Overages:

  • Shelf build-up when new unit is shorter than old
  • Converting from gas to electric OR vise versa (may require electrician and/ or local gas provider)
  • Customer carpentry work to allow new appliance to fit

For a full list of requirements or further assistance please call 1-877-694-3909 or visit quicktask.com/cas

BBQ Assembly in Home

The Quick Contractors Installer will:

  • Un-package and inspect the unit to ensure there are no missing or damaged pieces
  • Assembly of the BBQ
  • Installation of any accessories such as the ignitor, side burner, etc.
  • Review installation and proper operation with customer upon completion
  • Final clean up of job site


Note: All associated packaging of the unit that was installed will be broken down and placed in storage location OR outside as required

For a full list of requirements or further assistance please call 1-877-694-3909 or visit quicktask.com/cas

ADDITIONAL SERVICES


If you do not see the service you require, please reach out to us. There are a wide arrangement of services available that may not be listed.


For a full list of requirements or further assistance please call 1-877-694-3909 or visit quicktask.com/cas
Delivery