For Lower Prices Than Online - Visit In Store, Call or Chat*
Induction - Ready Cookware Bonus Offer
Save 10% on a qualifying Jenn-Air appliance, 15% on 2 or 3, 20% on 4 or more!
4.8 64
Jenn-Air JGCP748HM
>> View 2020 JennAir Parts & Accessories Guide << >> View 2020 JennAir Parts & Accessories Guide <<
2JEZ94
MSRP Price
$7,949
0% off
-$2
 Instant Rebate (Ends October 31)
-$795
Promo
$7,947
Jenn-Air Promo
$7,154  (10% off)  if you buy this item.
$6,757  (15% off)  if you buy 2 or 3 items.
$6,359  (20% off)  if you buy 4+ items.
* Only on eligible Jenn-Air items
 Add to Cart
Call Local Showroom
Ratings & Reviews
4.8
97%
recommend this
Read Reviews
(64 reviews)
Similar Colours and Options
JGCP548HM
$6,704.00 CAD
JGCP648HM
$6,704.00 CAD
JGCP748HL
$7,154.00 CAD
2JEZ94
Region Availability:
15 - 17 Business Days
When will I get this?
 
Reserve & Pick Up
FREE
Distribution Centres
Address
Units Available
Woodbridge, ON
27 Director Crt.
Winnipeg, MB
191 Elan Blvd
Burnaby, BC
8010 Winston St.
Ottawa, ON
55 Banton St.
Laval, QC
1340 Boul. Dagenais Ouest
Dartmouth, NS
315 Wilkinson Ave.
Calgary, AB
2777 23 Ave. NE
In stock

Protect your purchase with an extended warranty.

Protect purchase for 2 years: $149.99 CAD
Protect purchase for 3 years: $239.99 CAD

Description & Features

Jenn-Air Noir JGCP748HM Gas Rangetop, 48 inch Exterior Width, 6 Burners, Stainless Steel colour , Griddle, Grill
Sealed brass burners. Precise, dual flames. Unmistakable firepower erupting through cast-iron grates. Turn on the heat without the click-click clamor, and sear and simmer to satisfy your deepest hunger.

18,000 BTU Dual-Stacked PowerBurner
18,000 BTU Dual-Stacked PowerBurner
This 18,000 BTU dual-stacked PowerBurner can handle high-powered cooking while still being gentle enough for delicate simmering with turndown of 1,650 BTU.
20,000 BTU Dual-Stacked PowerBurner
20,000 BTU Dual-Stacked PowerBurner
This 20,000 BTU dual-stacked PowerBurner can handle high-powered cooking while still being gentle enough for delicate simmering with turndown of 1,650 BTU.
Cast Iron Grates
Cast Iron Grates
Robust geometric grates form one graceful surface, crafted to withstand heavy woks and cookware.
Chrome-Infused Griddle
Chrome-Infused Griddle
Cast off porous, superficially plated options. Go deeper. Infused with chrome, our griddle cleans up well after heavy usage.
Electronic Ignition with Flame-Sensing™ Reignition
Electronic Ignition with Flame-Sensing™ Reignition
Burnout banned. If a sudden draft blows out a flame, intelligent Flame-Sensing™ reignition automatically sparks it back to life.
Grill
Grill
Grilling knows no season. Our founder's legacy is rekindled as we bring grilling back indoors. Harness 16,000 BTUs of searing, even heat coursing beneath cast iron grates.
Halo-Effect Knobs
Halo-Effect Knobs
A halo of luminary LEDs glows softly when the burner is lit or the oven is on.

  • 14 Rangetop Configurations
  • Bend fire to your will. Grills, griddles, brass burners. Three widths. With 14 unique configurations, it s up to you. Cast off porous, superficially plated options. Go deeper. Infused with chrome, our griddle cleans up well after heavy usage. Underneath, a serpentine element powers our best griddle preheat. Fire up the grill for indoor entertainment on your terms.
  • 18,000 BTU Dual-Stacked PowerBurner
  • This 18,000 BTU dual-stacked PowerBurner can handle high-powered cooking while still being gentle enough for delicate simmering with turndown of 1,650 BTU.
  • 20,000 BTU Dual-Stacked PowerBurner
  • This 20,000 BTU dual-stacked PowerBurner can handle high-powered cooking while still being gentle enough for delicate simmering with turndown of 1,650 BTU.
  • 9,000 BTU Dual-Stacked PowerBurner
  • A dual-stacked PowerBurner that reaches a maximum power level of 9,000 BTU and fulfills most everyday cooking functions with turndown of 1,000 BTU.
  • Cast Iron Grates
  • Robust geometric grates form one graceful surface, crafted to withstand heavy woks and cookware.
  • Chrome-Infused Griddle
  • Cast off porous, superficially plated options. Go deeper. Infused with chrome, our griddle cleans up well after heavy usage.
  • Dual-Stacked PowerBurners
  • Two stacked, symmetrical flames bloom and retreat at your inclination, offering total control over heat levels. High-heat searing and wok cooking. Low, slow simmer and melt. Infinite intermediate settings satisfy every appetite.
  • Electronic Ignition with Flame-Sensing™ Reignition
  • Burnout banned. If a sudden draft blows out a flame, intelligent Flame-Sensing™ reignition automatically sparks it back to life.
  • Grill
  • Grilling knows no season. Our founder's legacy is rekindled as we bring grilling back indoors. Harness 16,000 BTUs of searing, even heat coursing beneath cast iron grates.
  • Halo-Effect Knobs
  • A halo of luminary LEDs glows softly when the burner is lit or the oven is on.
  • NOIR™ Design Expression
  • Sculpted in stainless steel, the NOIR™ Design Expression features structured grates and an illusive badge. Explore the artful mystery of a minimalist design that rejects dated ideals of beauty.
  • Star-K Certified

Manufacturer's Warranty: 2 years

UPC: 883049469898

EAN: 0883049469898

Specs

Certifications
Prop65 Standard
Ul Yes
Controls
Control Location Front
Control Type Knobs
Infinite Heat Controls No
Cooktop Details
Cooktop Surface Color Black
Cooktop Surface Material Porcelain Coated Steel
Digital Display No
Griddle Included Yes, Integrated
Heating Element On Indicator Light Yes
Hot Surface Indicator Light No
Ignition Type Flame-Sensing™ Re-ignition
Details
Automatic Pan Detection No
Cooktop Configuration Burners with Integrated Grill and Griddle
Design Expression NOIR™
Fuel Type Gas
Installs Over Built-in Oven No
Lp Convertible Yes - Kit Included
Power Outage Compatible Yes (Gas Cooktop Burners Only)
Dimensions
Product Height 7.4375
Carton Height 19.5
Gross Weight 170
Carton Width 51.63
Product Depth 27.5
Cutout Width Min 47.375
Cutout Depth 22.25
Carton Depth 34.5
Cutout Width 47.375
Cutout Depth Min 22.25
Cutout Width Max 47.875
Net Weight 144
Product Width 47.875
Electrical
208v Compatible No
Power Cord Included Yes
Element/burner Details
Cooktop Element Style Sealed Burner
Cooktop Type Rangetop
Left Front Element-burner Power 20,000 BTU
Left Front Element-burner Type Dual
Left Rear Element-burner Power 18,000 BTU
Left Rear Element-burner Type Dual-Stacked Burner
Number of Cooking Element-burners 4
Power Boost No
Right Front Element-burner Power 20,000 BTU
Right Rear Element-burner Power 9,000 BTU
Right Rear Element-burner Type Dual-Stacked Burner
Exterior Details
Knob Color Stainless Steel
Knob Type Metal
Grate Details
Grate Details Continuous; Dishwasher Safe; Individual; Matte Finish; Porcelain Coated Cast Grates
Ventilation Details
Downdraft Vent No

Dimensions
Depth 27 1/2
Width 47 7/8
Height 7 7/16
Carton Depth 34 1/2
Carton Height 19 1/2
Carton Width 51 11/16
Cutout Depth 22 1/4
Cutout Width 47 3/8
Gross Weight 170
Maximum Height 11 15/16
Net Weight 144.0
 
Certifications
Prop 65 Standard
UL UL
 
Configuration and Overview
Fuel Type Gas
Cooktop Type Rangetop
Size (IN,inches) 48
Installs Over Built-In Oven No
LP Convertible Yes - Kit Included
Power Boost No
 
Controls
Control Location Front
Control Type Knobs
Infinite Heat Controls No
Knob Color Stainless Steel
Knob Type Metal
 
Appearance
Digital Display No
 
Cooktop Details
Automatic Pan Detection No
Downdraft Vent No
Heating Element On Indicator Light Yes
Hot Surface Indicator Light No
Cooktop Surface Color Black
Cooktop Surface Material Porcelain Coated Steel
Number of Cooking Element-Burners 4
Cooktop Element Style Sealed Burner
Cooktop Configuration Burners with Integrated Grill and Griddle
Grate Details Continuous,Dishwasher Safe,Matte Finish,Porcelain Coated Cast Grates
Ignition Type Flame-Sensing™ Re-ignition
Number of Grates 2
Left Front Element-Burner Power 20,000 BTU
Left Rear Element-Burner Power 18,000 BTU
Left Rear Element-Burner Type Dual
Right Front Element-Burner Power 20,000 BTU
Left Front Element-Burner Type Dual
Right Rear Element-Burner Power 9000 BTU
Right Rear Element-Burner Type Dual
 
Features
Griddle Yes, Integrated
Power Outage Compatible Yes (Gas Cooktop Burners Only)
 
Electrical
Amps 15
208V Compatible No
Hz 60
Volts 120
Power Cord Included Yes
 
Refinement
Style Cooktops
 
Design Type
Design Expression NOIR™

Manuals

>> View 2020 JennAir Parts & Accessories Guide << >> View 2020 JennAir Parts & Accessories Guide <<

Video

Reviews

Rebates
Warranty
Financing
Install
Basic installation and delivery services are available from CAS
Click here for more details.

Advanced Installation Services (After Delivery)
Offered by Quick Contractors®
CAS Suggested Installation Provider
 1-877-694-3909
To book service online please visit quicktask.com/cas

SELECT CATEGORY FOR A LIST OF AVAILABLE INSTALLATION SERVICES

Refrigerator

Refrigerator Installation Service (New Waterline) by Quick Contractors

Things to note:

  • This service should be purchased if an entirely new waterline is required.
  • If this is replacing your existing refrigerator, our delivery team will uncrate and move your new purchase into place. They will not plug it in.
  • If there is open floor access, 60 feet of waterline will be included in the installation.
  • The Quick Contractors installer will NOT remove packaging or provide haul away services.
  • Refrigerator door reversal service can be added for an extra cost. Please contact your local store for details.

For a full list of requirements or further assistance please call 1-877-694-3909 or visit quicktask.com/cas

Gas Range

Gas Range Installation Service with New Flexible Hose by Quick Contractors

Things to note:

  • This package does NOT include removal of any packaging.
  • This service does NOT include haul away.
  • Extra charges will apply if shut-off valves, gas permits or any custom carpentry work is needed to allow the new appliance to fit.
  • If a completely new installation is required please call 1-877-694-3909 or visit quicktask.com/cas to arrange for an on-site quotation. Once the on-site inspection is completed, a Quick Contractors installer will provide a detailed quotation of the work required and the associated cost. The quote includes all necessary plumbing, electrical, and any other trades and permits required to facilitate the completion of the new installation. All fees for an on-site inspection are non-refundable and must be paid for at your local CAS showroom.

For a full list of requirements or further assistance please call 1-877-694-3909 or visit quicktask.com/cas

WASHER & DRYER

Gas Dryer Installation Service with New Flexible Hose by Quick Contractors

Things to note:

  • This service should be purchased if there was an existing gas dryer in place before.
  • If a completely new installation is required please call 1-877-694-3909 or visit quicktask.com/cas to arrange for an on-site quotation. Once the on-site inspection is completed, a Quick Contractors installer will provide a detailed quotation of the work required and the associated cost. The quote includes all necessary plumbing, electrical, and any other trades and permits required to facilitate the completion of the new installation. All fees for an on-site inspection are non-refundable and must be paid for at your local CAS showroom.
  • The Quick Contractors installer will NOT remove packaging or provide haul away services.
  • Extra charges will apply if any shut-off valves, gas permits, vent-less exhaust kits, conversion kits, vent hose, stacking of items, expansion and reduction adapters, or custom carpentry work is needed to allow the new appliance to fit.


White Glove Dryer (Electric only!) Installation

Things to note:

  • Delivery person will complete this at the time of delivery.
  • Additional charges will apply at point of purchase.



White Glove Washing Machine Installation

Things to note:

  • Delivery person will complete this at the time of delivery.
  • Additional charges will apply at point of purchase.

For a full list of requirements or further assistance please call 1-877-694-3909 or visit quicktask.com/cas

Dishwasher

Dishwasher with Hose Installation and Haul Away Service

Things to note:

  • Delivery person will pick-up and deliver the unit and remove its packaging.
  • This is a basic installation into an existing outlet.
  • A 6 feet stainless steel braided fill hose (supply line) is included with this installation service.
  • Delivery person will haul away the old unit and dispose of all packing and materials.
  • Extra charges will apply if any risers, air gaps, pigtails, elbows, on/off switches, working in crawl spaces, or custom carpentry work is needed to remove old unit.
  • If a completely new installation is required please call 1-877-694-3909 or visit quicktask.com/cas to arrange for an on-site quotation. Once the on-site inspection is completed, a Quick Contractors installer will provide a detailed quotation of the work required and the associated cost. The quote includes all necessary plumbing, electrical, and any other trades and permits required to facilitate the completion of the new installation. All fees for an on-site inspection are non-refundable and must be paid for at your local CAS showroom.


Dishwasher with Hose Installation Service

Things to note:

  • This is a basic installation into an existing outlet.
  • You must remove the packaging prior to the installation.
  • Your unit should be placed near the intended installation site in advance of the Quick Contractor installer's arrival, unless appliance delivery has been purchased.
  • Please disconnect your existing unit.
  • A 6 feet stainless steel braided fill hose (supply line) is included with this installation service.
  • Extra charges will apply if any risers, air gaps, pigtails, elbows, on/off switches, working in crawl spaces, or custom carpentry work is needed to remove the old unit.
  • If a completely new installation is required please call 1-877-694-3909 or visit quicktask.com/cas to arrange for an on-site quotation. Once the on-site inspection is completed, a Quick Contractors installer will provide a detailed quotation of the work required and the associated cost. The quote includes all necessary plumbing, electrical, and any other trades and permits required to facilitate the completion of the new installation. All fees for an on-site inspection are non-refundable and must be paid for at your local CAS showroom.

For a full list of requirements or further assistance please call 1-877-694-3909 or visit quicktask.com/cas

Range Hood

Range Hood (Ductless) Installation by Quick Contractors

Things to note:

  • This service does NOT include haul away and/or disposal of packaging.
  • If a completely new installation is required please call 1-877-694-3909 or visit quicktask.com/cas to arrange for an on-site quotation. Once the on-site inspection is completed, a Quick Contractors installer will provide a detailed quotation of the work required and the associated cost. The quote includes all necessary plumbing, electrical, and any other trades and permits required to facilitate the completion of the new installation. All fees for an on-site inspection are non-refundable and must be paid for at your local CAS showroom.


Range Hood (Ducted) Installation by Quick Contractors

Things to note:

  • This service does NOT include haul away and/or disposal of packaging.
  • If a completely new installation is required please call 1-877-694-3909 or visit quicktask.com/cas to arrange for an on-site quotation. Once the on-site inspection is completed, a Quick Contractors installer will provide a detailed quotation of the work required and the associated cost. The quote includes all necessary plumbing, electrical, and any other trades and permits required to facilitate the completion of the new installation. All fees for an on-site inspection are non-refundable and must be paid for at your local CAS showroom.


Vent Hood or Island Canopy Installation by Quick Contractors

Things to note:

  • This package does NOT include moving the existing duct work, or any drywall patching or painting.
  • This service does NOT include haul away and/or disposal of packaging.
  • If a completely new installation is required please call 1-877-694-3909 or visit quicktask.com/cas to arrange for an on-site quotation. Once the on-site inspection is completed, a Quick Contractors installer will provide a detailed quotation of the work required and the associated cost. The quote includes all necessary plumbing, electrical, and any other trades and permits required to facilitate the completion of the new installation. All fees for an on-site inspection are non-refundable and must be paid for at your local CAS showroom.

For a full list of requirements or further assistance please call 1-877-694-3909 or visit quicktask.com/cas

OTR – Microwave

The Quick Contractors Installer will:

  • Remove packaging from unit and inspect prior to installation
  • Disconnect electrical service to existing OTR
  • Disconnect Duct
  • Mount, center (if possible) and secure support bracket for new OTR as required by manufacturer’s specifics
  • Check and rotate, if necessary, exhaust fan, as required for excising ventilation
  • Connect and seal to existing duct, if necessary
  • Plug OTR cord into receptacle and secure with hardware provided
  • Install all accessory filters, covers, panels and/or racks
  • Test OTR by activating and monitoring a heating cell (using container filled with water), the exhaust fan and all lights and remaining accessories
  • If OTR is mounted using ductless application, installer will ensure accessory charcoal filter is properly installed


Note: All associated packaging of the unit that was installed will be broken down and placed in storage location OR outside as required


Common Overages:

  • Dedicated 110-volt electrical line
  • Changing a round vent to a rectangular vent OR vice versa
  • Installing an electrical receptacle box if improper service was sold
  • Additional duct work to allow transition from eternal exhaust to recirculating OR vise versa
  • Carpentry work to allow new OTR to fit


For a full list of requirements or further assistance please call 1-877-694-3909 or visit quicktask.com/cas

Electric Cooktop

The Quick Contractors Installer will:

  • Remove packaging from unit and inspect prior to installation
  • Set cooktop into opening
  • Extend leveling brackets to floor of cabinet so cooktop sits straight
  • Secure the cooktop to the countertop
  • Screw leveling brackets to bottom of cabinet
  • Run appropriate power cable into cabinet
  • Connect cooktop to electrical box and receptacle
  • Plug cooktop power cord into outlet
  • Test Cooktop by activating and monitoring all surface burner elements, all controls, accessories (Clock, timer, setting, etc.)


Note: All associated packaging of the unit that was installed will be broken down and placed in storage location OR outside as required


Common Overages:

  • Carpentry work to allow the new appliance to fit

For a full list of requirements or further assistance please call 1-877-694-3909 or visit quicktask.com/cas

Gas Cooktop

The Quick Contractors Installer will:

  • Remove packaging from unit and inspect prior to installation
  • Terminate gas service from shut-off valve, verify gas is turned off at shut-off valve and then disconnect gas from appliance. If no shut off valve is present, additional charges can be applied to terminate gas service and install shut-off valve, but not to exceed authorized additional charge estimate provided to customer
  • Secure the Cooktop to the countertop
  • Screw leveling brackets to bottom of cabinet
  • Extend leveling brackets to floor of cabinet so cooktop sits straight
  • Connect cooktop to electrical box and receptacle and plug cooktop power cord into outlet
  • Run appropriate power cable into cabinet
  • Ensure line is capped and there are no leaks
  • Connect gas service and ventilation to new gas appliance
  • Turn gas service back on and test all connections for leaks
  • Monitor gas service and ensure there are no leaks
  • Ensure all accessories; (grease, pants, racks, burner faps, lint filter, etc.) are installed on appliance
  • Test gas appliance by activating and monitoring all surface burner elements, all controls, accessories (Clock, timer, setting, etc.), all ventilation connections (Check exterior wall cap for debris), Ensure all burner elements are adjusted according to display proper flame characteristics
  • Includes new mandatory flex hose required by code


Note: All associated packaging of the unit that was installed will be broken down and placed in storage location OR outside as required


Common Overages:

  • Shut off valve
  • Conversion kits
  • Custom carpentry work to allow the new appliance to fit

For a full list of requirements or further assistance please call 1-877-694-3909 or visit quicktask.com/cas

Wall Oven Single

The Quick Contractors Installer will:

  • A two-person team will install single wall ovens
  • Terminate electrical service for electric oven and disconnect from appliance
  • Ensure electrical cord has been unplugged to prevent damage to receptacle
  • Connect electrical service to new electric oven
  • Ensure all accessories (grates, pants, racks, burns caps, etc.) are installed on appliance
  • Test wall oven by activating and monitoring all surface burner elements, broiler, oven OR interior heating elements, all controls, accessories (clock, timer, setting, etc.), oven door, storage drawer, and ensure all burner elements are adjusted accordingly


Note: All associated packaging of the unit that was installed will be broken down and placed in storage location OR outside as required


Common Overages:

  • Shelf build-up when new unit is shorter than old
  • Converting from gas to electric OR vise versa (may require electrician and/ or local gas provider)
  • Customer carpentry work to allow new appliance to fit

For a full list of requirements or further assistance please call 1-877-694-3909 or visit quicktask.com/cas

BBQ Assembly in Home

The Quick Contractors Installer will:

  • Un-package and inspect the unit to ensure there are no missing or damaged pieces
  • Assembly of the BBQ
  • Installation of any accessories such as the ignitor, side burner, etc.
  • Review installation and proper operation with customer upon completion
  • Final clean up of job site


Note: All associated packaging of the unit that was installed will be broken down and placed in storage location OR outside as required

For a full list of requirements or further assistance please call 1-877-694-3909 or visit quicktask.com/cas

ADDITIONAL SERVICES


If you do not see the service you require, please reach out to us. There are a wide arrangement of services available that may not be listed.


For a full list of requirements or further assistance please call 1-877-694-3909 or visit quicktask.com/cas
Delivery
037154 03CR7154