For Lower Prices Than Online - Visit In Store, Call or Chat*
BUNDLE & SAVE UP TO 35% OFF* - Call, Chat + In Store Only
Save up to $150 in multiple offers!
Elica EBD51SS1
Elica Wine & Beverage 2024 Line Up Elica Wine & Beverage 2024 Line Up
2KWRJR
Save An Additional 5% GST Instore, Chat or Phone
Save An Additional 5% GST Instore, Chat or Phone
MSRP Price
$3,329
13% off
-$430
Online Price
$2,899
Multi-Offer Combo Deal!
Buy this item and make your picks during checkout!
Grab more than one offer, up to $150 in savings!* 🛈  Go on -- don't be shy.
Take Free 1-2 Years Extended Warranty! ($59 - $149)
Take Free Old Appliance Removal! ($20)
Take $150 off another item!
* Each purchased product on the order which bears this offer can have its Multi-Offer max. savings allowance redeemed towards one (1) or more offers, however, allowance amounts and leftover allowance balances from multiple purchased products on the same order cannot be merged for use towards any single offer redemption.  Certain other items on the order may disqualify the order from a "Free Delivery" offer redemption.  May not be combined with any other offer.
Promo
Save up to $150 in multiple offers!
 Add to Cart
Call Local Showroom
2KWRJR
Region Availability:
🛈 *1 WEEK
When will I get this?
 
Reserve & Pick Up
FREE
Distribution Centres
Address
Units Available
Woodbridge, ON
27 Director Crt.
Winnipeg, MB
191 Elan Blvd
Burnaby, BC
8010 Winston St.
Ottawa, ON
55 Banton St.
Laval, QC
1340 Boul. Dagenais Ouest
Dartmouth, NS
315 Wilkinson Ave.
Calgary, AB
2777 23 Ave. NE

Protect your purchase with an extended warranty.

Protect purchase for 2 years: $99.99 CAD
Protect purchase for 3 years: $169.99 CAD

Description & Features

Elica EBD51SS1 Under Counter Refrigeration, 24 inch Width, 24 inch Width, Custom Panel Ready, Panel Ready

Two drawer, single zone

RISERVA - EBD51SS1 Is the perfect solution for your refrigeration needs. This Single Zone Double Drawer Unit comes with a Black Cabinet and 304 Stainless Steel solid doors and designed to be Panel Ready Convertible, making it blend seamlessly into your kitchen cabinetry. The drawers are spacious and can accommodate up to 137 L. Featuring an electronic control panel with a white LED readout, providing easy access to temperature adjustments ranging 34° to 64°. With its sleek design, this drawer unit is sure to add style and functionality to your kitchen.


  • EPC technology
  • Meet Elica s Intelligent System with sensors that deliver precise and consistent temperature & humidity evenly throughout the entire compartment, so that all stored bottles are preserved under the same conditions.
  • Quiet operation
  • Elica offers a Speed-controlled motor, reducing exterior sound levels, while offering high ventilation performance to keep constant interior temperature and dampening any possible vibration that could disturb the preservation of wine or beverages.
  • Eco mode
  • Sustainable and environmentally friendly: Eco-Mode will maintain optimum interior temperature, while saving energy consumption turning the lights OFF.
  • Door open alarm
  • To save energy and ensure proper preservation of your beverages, all Elica Undercabinet Refrigeration products come with a Door-Open Alarm, that will repeatedly beep when the door has been left ajar for longer than 5 minutes.

Technical features

  • WIDTH

    24”

  • DIMENSIONS

    23 7/16" W x 24 1/64" D x 33 55/64" H

  • WEIGHT

    130 lbs

  • INSTALLATION TYPE

    Built-in and Free Standing

  • REFRIGERANT TYPE

    R600a

  • VOLUME

    4.7 cu ft (137L)

  • SOUND LEVEL

    39 dBA

  • INTERIOR FINISH

    Stainless Steel

  • LIGHTNING

    White LED

  • CONTROLS

    Capacitive Touch Display with White Numbers

  • TEMPERATURE RANGE

    34° to 64°

TOP DRAWER

  • TOTAL CAPACITY

    54 cans (12 oz)

  • DRAWER DIVIDERS

    2 Adjustable Stainless steel Dividers

BOTTOM DRAWER

  • TOTAL CAPACITY

    59 cans (12 oz)

  • DRAWER DIVIDERS

    1 Fixed Tubular Divider

Others

  • Anti Damping System

  • Sabbath Mode

  • Stylish look with tubular handle

Manufacturer's Warranty: 2 years

Specs

Technical features
Width 24
Dimensions 23 7/16" W x 24 1/64" D x 33 55/64" H
Weight 130 lbs
Installation type Built-in and Free Standing
Refrigerant type R600a
Volume 4.7 cu ft (137L)
Sound level 39 dBA
Interior finish Stainless Steel
Lightning White LED
Controls Capacitive Touch Display with White Numbers
Temperature range 34° to 64°
TOP DRAWER
Total Capacity 54 cans (12 oz)
Drawer Dividers 2 Adjustable Stainless steel Dividers
BOTTOM DRAWER
Total Capacity 59 cans (12 oz)
Drawer Dividers 1 Fixed Tubular Divider

Specifications

Installation Type:  
Built-In & Free-Standing
Door Finish:  
304 Stainless Steel & Panel Ready Convertible
Door Handle:  
Tubular
Cabinet Finish:  
Black
Interior Finish:  
304 Stainless Steel
Volume:  
4.7 Cu. Ft. (137L)
Sound Level:  
39 dBA
Lighting:  
White LED
Controls:  
Electronic Control with White LED Readout
Temperature Range:  
34° to 64°F
Refrigerant Type:  
R600a
Top Drawer
Top Drawer Capacity:  
54 (12oz) Cans
Drawer Dividers:  
2 Adjustable Stainless Steel Dividers
Bottom Drawer
Bottom Drawer Capacity:  
59 (12oz) Cans
Drawer Dividers:  
1 Fixed Tubular Divider
Electrical Specifications
Compressor Brand:  
Embraco
Min Circuit Required:  
15A
AC Power:  
115 V / 60 Hz
Amperage:  
1.25 A
Plug Type:  
B
Dimensions & Weight
Standard Width:  
24"
Product Width:  
23 7/16"
Product Depth:  
24"
Product Height:  
33 7/8"
Weight:  
130 lbs.

Manuals

Elica Wine & Beverage 2024 Line Up Elica Wine & Beverage 2024 Line Up

Video

Reviews

Rebates
Warranty
Financing
Install
Basic installation and delivery services are available from CAS
Click here for more details.

Advanced Installation Services (After Delivery)
Offered by Quick Contractors®
CAS Suggested Installation Provider
 1-877-694-3909
To book service online please visit quicktask.com/cas

SELECT CATEGORY FOR A LIST OF AVAILABLE INSTALLATION SERVICES

Refrigerator

Refrigerator Installation Service (New Waterline) by Quick Contractors

Things to note:

  • This service should be purchased if an entirely new waterline is required.
  • If this is replacing your existing refrigerator, our delivery team will uncrate and move your new purchase into place. They will not plug it in.
  • If there is open floor access, 60 feet of waterline will be included in the installation.
  • The Quick Contractors installer will NOT remove packaging or provide haul away services.
  • Refrigerator door reversal service can be added for an extra cost. Please contact your local store for details.

For a full list of requirements or further assistance please call 1-877-694-3909 or visit quicktask.com/cas

Gas Range

Gas Range Installation Service with New Flexible Hose by Quick Contractors

Things to note:

  • This package does NOT include removal of any packaging.
  • This service does NOT include haul away.
  • Extra charges will apply if shut-off valves, gas permits or any custom carpentry work is needed to allow the new appliance to fit.
  • If a completely new installation is required please call 1-877-694-3909 or visit quicktask.com/cas to arrange for an on-site quotation. Once the on-site inspection is completed, a Quick Contractors installer will provide a detailed quotation of the work required and the associated cost. The quote includes all necessary plumbing, electrical, and any other trades and permits required to facilitate the completion of the new installation. All fees for an on-site inspection are non-refundable and must be paid for at your local CAS showroom.

For a full list of requirements or further assistance please call 1-877-694-3909 or visit quicktask.com/cas

WASHER & DRYER

Gas Dryer Installation Service with New Flexible Hose by Quick Contractors

Things to note:

  • This service should be purchased if there was an existing gas dryer in place before.
  • If a completely new installation is required please call 1-877-694-3909 or visit quicktask.com/cas to arrange for an on-site quotation. Once the on-site inspection is completed, a Quick Contractors installer will provide a detailed quotation of the work required and the associated cost. The quote includes all necessary plumbing, electrical, and any other trades and permits required to facilitate the completion of the new installation. All fees for an on-site inspection are non-refundable and must be paid for at your local CAS showroom.
  • The Quick Contractors installer will NOT remove packaging or provide haul away services.
  • Extra charges will apply if any shut-off valves, gas permits, vent-less exhaust kits, conversion kits, vent hose, stacking of items, expansion and reduction adapters, or custom carpentry work is needed to allow the new appliance to fit.


White Glove Dryer (Electric only!) Installation

Things to note:

  • Delivery person will complete this at the time of delivery.
  • Additional charges will apply at point of purchase.



White Glove Washing Machine Installation

Things to note:

  • Delivery person will complete this at the time of delivery.
  • Additional charges will apply at point of purchase.

For a full list of requirements or further assistance please call 1-877-694-3909 or visit quicktask.com/cas

Dishwasher

Dishwasher with Hose Installation and Haul Away Service

Things to note:

  • Delivery person will pick-up and deliver the unit and remove its packaging.
  • This is a basic installation into an existing outlet.
  • A 6 feet stainless steel braided fill hose (supply line) is included with this installation service.
  • Delivery person will haul away the old unit and dispose of all packing and materials.
  • Extra charges will apply if any risers, air gaps, pigtails, elbows, on/off switches, working in crawl spaces, or custom carpentry work is needed to remove old unit.
  • If a completely new installation is required please call 1-877-694-3909 or visit quicktask.com/cas to arrange for an on-site quotation. Once the on-site inspection is completed, a Quick Contractors installer will provide a detailed quotation of the work required and the associated cost. The quote includes all necessary plumbing, electrical, and any other trades and permits required to facilitate the completion of the new installation. All fees for an on-site inspection are non-refundable and must be paid for at your local CAS showroom.


Dishwasher with Hose Installation Service

Things to note:

  • This is a basic installation into an existing outlet.
  • You must remove the packaging prior to the installation.
  • Your unit should be placed near the intended installation site in advance of the Quick Contractor installer's arrival, unless appliance delivery has been purchased.
  • Please disconnect your existing unit.
  • A 6 feet stainless steel braided fill hose (supply line) is included with this installation service.
  • Extra charges will apply if any risers, air gaps, pigtails, elbows, on/off switches, working in crawl spaces, or custom carpentry work is needed to remove the old unit.
  • If a completely new installation is required please call 1-877-694-3909 or visit quicktask.com/cas to arrange for an on-site quotation. Once the on-site inspection is completed, a Quick Contractors installer will provide a detailed quotation of the work required and the associated cost. The quote includes all necessary plumbing, electrical, and any other trades and permits required to facilitate the completion of the new installation. All fees for an on-site inspection are non-refundable and must be paid for at your local CAS showroom.

For a full list of requirements or further assistance please call 1-877-694-3909 or visit quicktask.com/cas

Range Hood

Range Hood (Ductless) Installation by Quick Contractors

Things to note:

  • This service does NOT include haul away and/or disposal of packaging.
  • If a completely new installation is required please call 1-877-694-3909 or visit quicktask.com/cas to arrange for an on-site quotation. Once the on-site inspection is completed, a Quick Contractors installer will provide a detailed quotation of the work required and the associated cost. The quote includes all necessary plumbing, electrical, and any other trades and permits required to facilitate the completion of the new installation. All fees for an on-site inspection are non-refundable and must be paid for at your local CAS showroom.


Range Hood (Ducted) Installation by Quick Contractors

Things to note:

  • This service does NOT include haul away and/or disposal of packaging.
  • If a completely new installation is required please call 1-877-694-3909 or visit quicktask.com/cas to arrange for an on-site quotation. Once the on-site inspection is completed, a Quick Contractors installer will provide a detailed quotation of the work required and the associated cost. The quote includes all necessary plumbing, electrical, and any other trades and permits required to facilitate the completion of the new installation. All fees for an on-site inspection are non-refundable and must be paid for at your local CAS showroom.


Vent Hood or Island Canopy Installation by Quick Contractors

Things to note:

  • This package does NOT include moving the existing duct work, or any drywall patching or painting.
  • This service does NOT include haul away and/or disposal of packaging.
  • If a completely new installation is required please call 1-877-694-3909 or visit quicktask.com/cas to arrange for an on-site quotation. Once the on-site inspection is completed, a Quick Contractors installer will provide a detailed quotation of the work required and the associated cost. The quote includes all necessary plumbing, electrical, and any other trades and permits required to facilitate the completion of the new installation. All fees for an on-site inspection are non-refundable and must be paid for at your local CAS showroom.

For a full list of requirements or further assistance please call 1-877-694-3909 or visit quicktask.com/cas

OTR – Microwave

The Quick Contractors Installer will:

  • Remove packaging from unit and inspect prior to installation
  • Disconnect electrical service to existing OTR
  • Disconnect Duct
  • Mount, center (if possible) and secure support bracket for new OTR as required by manufacturer’s specifics
  • Check and rotate, if necessary, exhaust fan, as required for excising ventilation
  • Connect and seal to existing duct, if necessary
  • Plug OTR cord into receptacle and secure with hardware provided
  • Install all accessory filters, covers, panels and/or racks
  • Test OTR by activating and monitoring a heating cell (using container filled with water), the exhaust fan and all lights and remaining accessories
  • If OTR is mounted using ductless application, installer will ensure accessory charcoal filter is properly installed


Note: All associated packaging of the unit that was installed will be broken down and placed in storage location OR outside as required


Common Overages:

  • Dedicated 110-volt electrical line
  • Changing a round vent to a rectangular vent OR vice versa
  • Installing an electrical receptacle box if improper service was sold
  • Additional duct work to allow transition from eternal exhaust to recirculating OR vise versa
  • Carpentry work to allow new OTR to fit


For a full list of requirements or further assistance please call 1-877-694-3909 or visit quicktask.com/cas

Electric Cooktop

The Quick Contractors Installer will:

  • Remove packaging from unit and inspect prior to installation
  • Set cooktop into opening
  • Extend leveling brackets to floor of cabinet so cooktop sits straight
  • Secure the cooktop to the countertop
  • Screw leveling brackets to bottom of cabinet
  • Run appropriate power cable into cabinet
  • Connect cooktop to electrical box and receptacle
  • Plug cooktop power cord into outlet
  • Test Cooktop by activating and monitoring all surface burner elements, all controls, accessories (Clock, timer, setting, etc.)


Note: All associated packaging of the unit that was installed will be broken down and placed in storage location OR outside as required


Common Overages:

  • Carpentry work to allow the new appliance to fit

For a full list of requirements or further assistance please call 1-877-694-3909 or visit quicktask.com/cas

Gas Cooktop

The Quick Contractors Installer will:

  • Remove packaging from unit and inspect prior to installation
  • Terminate gas service from shut-off valve, verify gas is turned off at shut-off valve and then disconnect gas from appliance. If no shut off valve is present, additional charges can be applied to terminate gas service and install shut-off valve, but not to exceed authorized additional charge estimate provided to customer
  • Secure the Cooktop to the countertop
  • Screw leveling brackets to bottom of cabinet
  • Extend leveling brackets to floor of cabinet so cooktop sits straight
  • Connect cooktop to electrical box and receptacle and plug cooktop power cord into outlet
  • Run appropriate power cable into cabinet
  • Ensure line is capped and there are no leaks
  • Connect gas service and ventilation to new gas appliance
  • Turn gas service back on and test all connections for leaks
  • Monitor gas service and ensure there are no leaks
  • Ensure all accessories; (grease, pants, racks, burner faps, lint filter, etc.) are installed on appliance
  • Test gas appliance by activating and monitoring all surface burner elements, all controls, accessories (Clock, timer, setting, etc.), all ventilation connections (Check exterior wall cap for debris), Ensure all burner elements are adjusted according to display proper flame characteristics
  • Includes new mandatory flex hose required by code


Note: All associated packaging of the unit that was installed will be broken down and placed in storage location OR outside as required


Common Overages:

  • Shut off valve
  • Conversion kits
  • Custom carpentry work to allow the new appliance to fit

For a full list of requirements or further assistance please call 1-877-694-3909 or visit quicktask.com/cas

Wall Oven Single

The Quick Contractors Installer will:

  • A two-person team will install single wall ovens
  • Terminate electrical service for electric oven and disconnect from appliance
  • Ensure electrical cord has been unplugged to prevent damage to receptacle
  • Connect electrical service to new electric oven
  • Ensure all accessories (grates, pants, racks, burns caps, etc.) are installed on appliance
  • Test wall oven by activating and monitoring all surface burner elements, broiler, oven OR interior heating elements, all controls, accessories (clock, timer, setting, etc.), oven door, storage drawer, and ensure all burner elements are adjusted accordingly


Note: All associated packaging of the unit that was installed will be broken down and placed in storage location OR outside as required


Common Overages:

  • Shelf build-up when new unit is shorter than old
  • Converting from gas to electric OR vise versa (may require electrician and/ or local gas provider)
  • Customer carpentry work to allow new appliance to fit

For a full list of requirements or further assistance please call 1-877-694-3909 or visit quicktask.com/cas

BBQ Assembly in Home

The Quick Contractors Installer will:

  • Un-package and inspect the unit to ensure there are no missing or damaged pieces
  • Assembly of the BBQ
  • Installation of any accessories such as the ignitor, side burner, etc.
  • Review installation and proper operation with customer upon completion
  • Final clean up of job site


Note: All associated packaging of the unit that was installed will be broken down and placed in storage location OR outside as required

For a full list of requirements or further assistance please call 1-877-694-3909 or visit quicktask.com/cas

ADDITIONAL SERVICES


If you do not see the service you require, please reach out to us. There are a wide arrangement of services available that may not be listed.


For a full list of requirements or further assistance please call 1-877-694-3909 or visit quicktask.com/cas
Delivery
132898 13AN2899 13TA2899