Bertazzoni PRO304BFEPGIT Dual Fuel Range, 30 inch Exterior Width, Self Clean, Convection, 4 Burners, 4.6 cu. ft. Capacity, 1 Ovens, Giallo Yellow colour Telescopic Gliding Extension Rack, Soft Close Door, Temperature Probe
Manufacturer's Warranty: 2 years
Category: Ranges
Online Price🛈 Info
MAP Price Explanation
Many appliance manufacturers mandate retailers to list product prices at minimum advertised prices (MAP Price).
CAS sales staff have the ability to significantly discount most product prices below our online advertised prices especially when purchasing multiple products.
Visit one of our many Canadian showrooms or call 877-374-3439 to speak with our knowledgeable sales staff to get the best prices on your appliances
$9,199
Today's Price: $9,199.00 Lowest Price: $9,199.00 on 2024-03-11 Highest Price: $10,399.00 on 2024-01-16
MIX & MATCH!
NOW FOR A LIMITED TIME, buy 2 or more eligible major kitchen/laundry appliances from separate categories and save instantly!* BUY 2 ITEMS, GET $150 OFF! BUY 3 ITEMS, GET $400 OFF! BUY 4 ITEMS, GET $650 OFF! BUY 5 ITEMS, GET $800 OFF! BUY 6 OR MORE ITEMS, GET $1,000 OFF!
Automatically applied during checkout or call 1-877-374-3439 to redeem this offer today! Show terms.
* Eligible items only. Eligible items are any product that advertises this promotion on its product page purchased at the regular advertised online price. Package must include a refrigerator 30" or larger in width. Excludes microwaves and ventilation. Qualifying purchase amount is based on the total selling value of eligible products only, before taxes. May not be combined with any other offer. Limited time period is indeterminate and promotion may change or end at any time without notice.
Bertazzoni PRO304BFEPGIT Dual Fuel Range, 30 inch Exterior Width, Self Clean, Convection, 4 Burners, 4.6 cu. ft. Capacity, 1 Ovens, Giallo Yellow colour Telescopic Gliding Extension Rack, Soft Close Door, Temperature Probe
The new Bertazzoni ranges are superb cooking appliances designed, engineered and made in Italy. All Bertazzoni appliances integrate seamlessly into style-harmonized suites for a true, high-performing kitchen.
The high-efficiency maintop with 4 brass burners features a dual ring 19,000 BTU power-burner that boils water in under 6 minutes (best in class), and 3 additional MonoBloc burners of variable size and power to suit every style of cooking, with delicate simmer at 750 BTUs.
The 4.6 cubic feet oven cavity is the largest in its class, with dual convection fan for balanced airflow and even temperature baking and roasting on 7 shelf levels. The elegant digital temperature gauge monitors the actual temperature in the oven and has integrated controls in the bezel for the food temperature probe. The extra wide electric broiler with optional convection is ideal for grilling and searing at high heat.
The soft-close oven door with edge-to-edge tempered glass is a masterpiece of European engineering and makes the oven door very easy to wipe clean. Convenient smooth-glide telescopic racks on 2 levels help loading and unloading the oven.
All Bertazzoni appliances are covered by a 2-year warranty.
High Efficiency Maintop
The maintop is designed to make cooking faster and more efficient thanks to the clever design that reduces the flame-to-cookware distance. You can use larger cookware more easily as the top is engineered with more space between the burners.
Flexibility and control are the heart of the 19,000 BTU dual-ring power burners. You can adjust the heat on each ring and move from a slow simmer to a fast boil instantly. The added control means every dish can be cooked to perfection.
Single Piece Worktop and Continuous Contour Grates
Molded from a single piece of aluminum, the worktop has no dirt traps or sharp angles, so it is very easy to keep clean and look its best. The cast iron contour grates are modeled on commercial grade ranges, giving you a larger and more stable cooking sur
The large silicon buffers add stability making it safer to use. The elegant low-profile back guard makes it simple for your range cooker to fit right into your kitchen design with flush counter depth installation.
It also works particularly well in island configurations, making for a sleek and stylish finish.
Electric Oven with Self-Clean Option
Homes with access to both fuel types allow you to choose a self-cleaning oven with your gas cooktop. They offer efficient, flexible, and easily controllable multi-level convection cooking.
The self-cleaning option works at the touch of a button, so you never have to scrub out your oven again. Control your oven with the elegant integrated temperature display and control panel.
It's easy to read with improved contrast and bezel-embedded buttons to select the desired cooking mode and control the food temperature probe.
New Air Fry Mode
This healthier cooking technique creates perfectly crisp food without the need to deep fry. For everything from French fries to meat, fish, and vegan recipes.
An increasingly popular cooking technique combines maximum ventilation with intense heat. A dedicated steel mesh basket boosts airflow around the ingredients for beautifully crisp and healthy food.
4 Sealed Burners
4 Monobloc Brass burners with up to 19000 BTU.
Counter Depth Design
Allows ranges to sit flush with cabinetry for seamless installation.
19000 BTU Power Burner
With dual ring flame delivering the fastest time-to-boil in its class.
Stainless Steel Worktop
Formed from one piece to allow easy cleaning with no gaps, joints, or screws.
European Convection Oven
For balanced airflow and even temperature baking and roasting on 7 shelf levels.
Oven Door
Soft-close oven door with edge-to-edge tempered glass.
Elegant Digital Gauge
For precise control of oven temperature during pre-heating and baking with integrated controls for the temperature probe.
1" Stainless Steel Backguard
For sleek design and integration into any kitchen.
Self-Clean
Utilizes high temperatures to effectively eliminate tough stains and grime.
To book service online please visit quicktask.com/cas
SELECT CATEGORY FOR A LIST OF AVAILABLE INSTALLATION SERVICES
Refrigerator
Refrigerator Installation Service (New Waterline) by Quick Contractors
Things to note:
This service should be purchased if an entirely new waterline is required.
If this is replacing your existing refrigerator, our delivery team will uncrate and move your new purchase into place. They will not plug it in.
If there is open floor access, 60 feet of waterline will be included in the installation.
The Quick Contractors installer will NOT remove packaging or provide haul away services.
Refrigerator door reversal service can be added for an extra cost. Please contact your local store for details.
For a full list of requirements or further assistance please call 1-877-694-3909 or visit quicktask.com/cas
Gas Range
Gas Range Installation Service with New Flexible Hose by Quick Contractors
Things to note:
This package does NOT include removal of any packaging.
This service does NOT include haul away.
Extra charges will apply if shut-off valves, gas permits or any custom carpentry work is needed to allow the new appliance to fit.
If a completely new installation is required please call 1-877-694-3909 or visit quicktask.com/cas to arrange for an on-site quotation. Once the on-site inspection is completed, a Quick Contractors installer will provide a detailed quotation of the work required and the associated cost. The quote includes all necessary plumbing, electrical, and any other trades and permits required to facilitate the completion of the new installation. All fees for an on-site inspection are non-refundable and must be paid for at your local CAS showroom.
For a full list of requirements or further assistance please call 1-877-694-3909 or visit quicktask.com/cas
WASHER & DRYER
Gas Dryer Installation Service with New Flexible Hose by Quick Contractors
Things to note:
This service should be purchased if there was an existing gas dryer in place before.
If a completely new installation is required please call 1-877-694-3909 or visit quicktask.com/cas to arrange for an on-site quotation. Once the on-site inspection is completed, a Quick Contractors installer will provide a detailed quotation of the work required and the associated cost. The quote includes all necessary plumbing, electrical, and any other trades and permits required to facilitate the completion of the new installation. All fees for an on-site inspection are non-refundable and must be paid for at your local CAS showroom.
The Quick Contractors installer will NOT remove packaging or provide haul away services.
Extra charges will apply if any shut-off valves, gas permits, vent-less exhaust kits, conversion kits, vent hose, stacking of items, expansion and reduction adapters, or custom carpentry work is needed to allow the new appliance to fit.
White Glove Dryer (Electric only!) Installation
Things to note:
Delivery person will complete this at the time of delivery.
Additional charges will apply at point of purchase.
White Glove Washing Machine Installation
Things to note:
Delivery person will complete this at the time of delivery.
Additional charges will apply at point of purchase.
For a full list of requirements or further assistance please call 1-877-694-3909 or visit quicktask.com/cas
Dishwasher
Dishwasher with Hose Installation and Haul Away Service
Things to note:
Delivery person will pick-up and deliver the unit and remove its packaging.
This is a basic installation into an existing outlet.
A 6 feet stainless steel braided fill hose (supply line) is included with this installation service.
Delivery person will haul away the old unit and dispose of all packing and materials.
Extra charges will apply if any risers, air gaps, pigtails, elbows, on/off switches, working in crawl spaces, or custom carpentry work is needed to remove old unit.
If a completely new installation is required please call 1-877-694-3909 or visit quicktask.com/cas to arrange for an on-site quotation. Once the on-site inspection is completed, a Quick Contractors installer will provide a detailed quotation of the work required and the associated cost. The quote includes all necessary plumbing, electrical, and any other trades and permits required to facilitate the completion of the new installation. All fees for an on-site inspection are non-refundable and must be paid for at your local CAS showroom.
Dishwasher with Hose Installation Service
Things to note:
This is a basic installation into an existing outlet.
You must remove the packaging prior to the installation.
Your unit should be placed near the intended installation site in advance of the Quick Contractor installer's arrival, unless appliance delivery has been purchased.
Please disconnect your existing unit.
A 6 feet stainless steel braided fill hose (supply line) is included with this installation service.
Extra charges will apply if any risers, air gaps, pigtails, elbows, on/off switches, working in crawl spaces, or custom carpentry work is needed to remove the old unit.
If a completely new installation is required please call 1-877-694-3909 or visit quicktask.com/cas to arrange for an on-site quotation. Once the on-site inspection is completed, a Quick Contractors installer will provide a detailed quotation of the work required and the associated cost. The quote includes all necessary plumbing, electrical, and any other trades and permits required to facilitate the completion of the new installation. All fees for an on-site inspection are non-refundable and must be paid for at your local CAS showroom.
For a full list of requirements or further assistance please call 1-877-694-3909 or visit quicktask.com/cas
Range Hood
Range Hood (Ductless) Installation by Quick Contractors
Things to note:
This service does NOT include haul away and/or disposal of packaging.
If a completely new installation is required please call 1-877-694-3909 or visit quicktask.com/cas to arrange for an on-site quotation. Once the on-site inspection is completed, a Quick Contractors installer will provide a detailed quotation of the work required and the associated cost. The quote includes all necessary plumbing, electrical, and any other trades and permits required to facilitate the completion of the new installation. All fees for an on-site inspection are non-refundable and must be paid for at your local CAS showroom.
Range Hood (Ducted) Installation by Quick Contractors
Things to note:
This service does NOT include haul away and/or disposal of packaging.
If a completely new installation is required please call 1-877-694-3909 or visit quicktask.com/cas to arrange for an on-site quotation. Once the on-site inspection is completed, a Quick Contractors installer will provide a detailed quotation of the work required and the associated cost. The quote includes all necessary plumbing, electrical, and any other trades and permits required to facilitate the completion of the new installation. All fees for an on-site inspection are non-refundable and must be paid for at your local CAS showroom.
Vent Hood or Island Canopy Installation by Quick Contractors
Things to note:
This package does NOT include moving the existing duct work, or any drywall patching or painting.
This service does NOT include haul away and/or disposal of packaging.
If a completely new installation is required please call 1-877-694-3909 or visit quicktask.com/cas to arrange for an on-site quotation. Once the on-site inspection is completed, a Quick Contractors installer will provide a detailed quotation of the work required and the associated cost. The quote includes all necessary plumbing, electrical, and any other trades and permits required to facilitate the completion of the new installation. All fees for an on-site inspection are non-refundable and must be paid for at your local CAS showroom.
For a full list of requirements or further assistance please call 1-877-694-3909 or visit quicktask.com/cas
OTR – Microwave
The Quick Contractors Installer will:
Remove packaging from unit and inspect prior to installation
Disconnect electrical service to existing OTR
Disconnect Duct
Mount, center (if possible) and secure support bracket for new OTR as required by manufacturer’s specifics
Check and rotate, if necessary, exhaust fan, as required for excising ventilation
Connect and seal to existing duct, if necessary
Plug OTR cord into receptacle and secure with hardware provided
Install all accessory filters, covers, panels and/or racks
Test OTR by activating and monitoring a heating cell (using container filled with water), the exhaust fan and all lights and remaining accessories
If OTR is mounted using ductless application, installer will ensure accessory charcoal filter is properly installed
Note: All associated packaging of the unit that was installed will be broken down and placed in storage location OR outside as required
Common Overages:
Dedicated 110-volt electrical line
Changing a round vent to a rectangular vent OR vice versa
Installing an electrical receptacle box if improper service was sold
Additional duct work to allow transition from eternal exhaust to recirculating OR vise versa
Carpentry work to allow new OTR to fit
For a full list of requirements or further assistance please call 1-877-694-3909 or visit quicktask.com/cas
Electric Cooktop
The Quick Contractors Installer will:
Remove packaging from unit and inspect prior to installation
Set cooktop into opening
Extend leveling brackets to floor of cabinet so cooktop sits straight
Secure the cooktop to the countertop
Screw leveling brackets to bottom of cabinet
Run appropriate power cable into cabinet
Connect cooktop to electrical box and receptacle
Plug cooktop power cord into outlet
Test Cooktop by activating and monitoring all surface burner elements, all controls, accessories (Clock, timer, setting, etc.)
Note: All associated packaging of the unit that was installed will be broken down and placed in storage location OR outside as required
Common Overages:
Carpentry work to allow the new appliance to fit
For a full list of requirements or further assistance please call 1-877-694-3909 or visit quicktask.com/cas
Gas Cooktop
The Quick Contractors Installer will:
Remove packaging from unit and inspect prior to installation
Terminate gas service from shut-off valve, verify gas is turned off at shut-off valve and then disconnect gas from appliance. If no shut off valve is present, additional charges can be applied to terminate gas service and install shut-off valve, but not to exceed authorized additional charge estimate provided to customer
Secure the Cooktop to the countertop
Screw leveling brackets to bottom of cabinet
Extend leveling brackets to floor of cabinet so cooktop sits straight
Connect cooktop to electrical box and receptacle and plug cooktop power cord into outlet
Run appropriate power cable into cabinet
Ensure line is capped and there are no leaks
Connect gas service and ventilation to new gas appliance
Turn gas service back on and test all connections for leaks
Monitor gas service and ensure there are no leaks
Ensure all accessories; (grease, pants, racks, burner faps, lint filter, etc.) are installed on appliance
Test gas appliance by activating and monitoring all surface burner elements, all controls, accessories (Clock, timer, setting, etc.), all ventilation connections (Check exterior wall cap for debris), Ensure all burner elements are adjusted according to display proper flame characteristics
Includes new mandatory flex hose required by code
Note: All associated packaging of the unit that was installed will be broken down and placed in storage location OR outside as required
Common Overages:
Shut off valve
Conversion kits
Custom carpentry work to allow the new appliance to fit
For a full list of requirements or further assistance please call 1-877-694-3909 or visit quicktask.com/cas
Wall Oven Single
The Quick Contractors Installer will:
A two-person team will install single wall ovens
Terminate electrical service for electric oven and disconnect from appliance
Ensure electrical cord has been unplugged to prevent damage to receptacle
Connect electrical service to new electric oven
Ensure all accessories (grates, pants, racks, burns caps, etc.) are installed on appliance
Test wall oven by activating and monitoring all surface burner elements, broiler, oven OR interior heating elements, all controls, accessories (clock, timer, setting, etc.), oven door, storage drawer, and ensure all burner elements are adjusted accordingly
Note: All associated packaging of the unit that was installed will be broken down and placed in storage location OR outside as required
Common Overages:
Shelf build-up when new unit is shorter than old
Converting from gas to electric OR vise versa (may require electrician and/ or local gas provider)
Customer carpentry work to allow new appliance to fit
For a full list of requirements or further assistance please call 1-877-694-3909 or visit quicktask.com/cas
BBQ Assembly in Home
The Quick Contractors Installer will:
Un-package and inspect the unit to ensure there are no missing or damaged pieces
Assembly of the BBQ
Installation of any accessories such as the ignitor, side burner, etc.
Review installation and proper operation with customer upon completion
Final clean up of job site
Note: All associated packaging of the unit that was installed will be broken down and placed in storage location OR outside as required
For a full list of requirements or further assistance please call 1-877-694-3909 or visit quicktask.com/cas
ADDITIONAL SERVICES
If you do not see the service you require, please reach out to us. There are a wide arrangement of services available that may not be listed.
For a full list of requirements or further assistance please call 1-877-694-3909 or visit quicktask.com/cas