For Lower Prices Than Online - Visit In Store, Call or Chat*
BUNDLE & SAVE UP TO 35% OFF* - Call, Chat + In Store Only
Buy any Whirlpool or Maytag laundry set and claim a one year supply of Swash laundry detergent
4.1 4408
Maytag MVW5430PBK
2K6Q8X
Call Now! 877-374-3439 Or Chat For Bundle Discounts
Call Now! 877-374-3439 Or Chat For Bundle Discounts
MAP Price🛈 Info

MAP Price Explanation
  
Many appliance manufacturers mandate retailers to list product prices at minimum advertised prices (MAP Price). 


CAS sales staff have the ability to significantly discount most product prices below our online advertised prices especially when purchasing multiple products.
 
Visit one of our many Canadian showrooms or call 877-374-3439 to speak with our knowledgeable sales staff to get the best prices on your appliances












Excludes: Whirlpool, Maytag, kitchenAid, Jennair brands
$997
MIX & MATCH!
NOW FOR A LIMITED TIME, buy 2 or more eligible major kitchen/laundry appliances from separate categories and save instantly!*
BUY 2 ITEMS, GET $150 OFF!
BUY 3 ITEMS, GET $400 OFF!
BUY 4 ITEMS, GET $650 OFF!
BUY 5 ITEMS, GET $800 OFF!
BUY 6 OR MORE ITEMS, GET $1,000 OFF!

Automatically applied during checkout or call 1-877-374-3439 to redeem this offer today! Show terms.
 Add to Cart
Call Local Showroom
Ratings & Reviews
4.1
79%
recommend this
Read Reviews
(4408 reviews)
Similar Colours and Options
2K6Q8X
Region Availability:
🛈 *2-7 Business Days
When will I get this?
 
Reserve & Pick Up
FREE
Distribution Centres
Address
Units Available
Woodbridge, ON
27 Director Crt.
Winnipeg, MB
191 Elan Blvd
Burnaby, BC
8010 Winston St.
Ottawa, ON
55 Banton St.
Laval, QC
1340 Boul. Dagenais Ouest
Dartmouth, NS
315 Wilkinson Ave.
Calgary, AB
2777 23 Ave. NE

Protect your purchase with an extended warranty.

Protect purchase for 2 years: $79.99 CAD
Protect purchase for 3 years: $129.99 CAD

Description & Features

Maytag MVW5430PBK Top Load Washer, 27 3/4 inch Width, 5.5 cu. ft. Capacity, 11 Wash Cycles, 5 Temperature Settings, 770 RPM Washer Spin Speed
This 5.5 cu. ft. capacity top load washer from Maytag delivers the stain-fighting power that’s built to handle tough loads. Use Extra Power for boosted stain fighting on any wash cycle while the Power™ impeller helps dissolve soils with a vigorous wash motion. The Deep Fill option delivers more water when you want it while the built-in water faucet rinses, spot treats or soaks clothes right in the washer—no extra steps needed. The durable 5-knob console along with the 10-year limited parts warranty* on the drive motor and wash basket tie it all together to help you easily power through laundry day. *See product warranty for details.

Top Features

Extra Power

Extra Power boosts stain fighting on any wash cycle with an intense pre-wash and extra agitation so you can walk away while stains wash away.

Deep Fill option

Get more water when you want it with the Deep Fill option. Choose from multiple water levels* to saturate loads, loosen stains and help soak away tough messes.

Built-in water faucet

The built-in water faucet rinses, spot treats or soaks clothes right in the washer—no extra steps needed. After three hours, the water drains, leaving clothes ready for the wash cycle.

Additional Features

Quick Wash cycle

Strapped for time? Using extra high-spin speeds, the Quick Wash cycle cleans small, lightly soiled loads in 30 minutes.* Get clean clothes fast by pairing it with the Quick Dry cycle on matching Maytag® dryers.

Power™ impeller

Trust the Power™ impeller to help dissolve stains and soils. Vigorous wash motions and triple action spray keep clothes thoroughly soaked with water and detergent.

Slow-close glass lid

Keep track of the action inside your washer with the slow-close glass lid. It offers a clear view of laundry and closes softly without slamming.

4.8 cu. ft. capacity

With 4.8 cu. ft. capacity, you can run fewer cycles while fitting in even more loads. This large capacity washer has enough space to wash 19 towels at once, saving time on daily housework.

Auto Sensing

Auto Sensing adjusts the water levels for each load to provide efficient cleaning.

Extra Rinse options

Two Extra Rinse options help ensure that messes and detergent are thoroughly rinsed away. Add it to heavily soiled clothes and loads with fabric softener to achieve an optimal clean.

10-year limited parts warranty* on the drive motor and stainless steel wash basket

We don’t just tell you a Maytag® washer will get your clothes clean for years: we confidently back our washers with a 10-year limited parts warranty* on the drive motor and stainless steel wash basket.

American Pride

We take pride in building strong, reliable appliances for your home. These washers are proudly assembled by hard-working employees in Clyde, Ohio.

Stainless steel wash basket

The stainless steel wash basket is designed for years of washes and built with sturdy materials to last for the long haul. It’s also backed by our 10-year limited parts warranty.*

Clean washer with affresh® cycle

Deep clean the inside of your washer with the affresh® washing machine cleaner tablet or liquid chlorine bleach. Just run the affresh® cycle approximately every 30 washes to ensure your machine stays clean.

An American company for over 100 years

Whirlpool Corporation started in 1911 as a small company in Benton Harbor, Michigan. Today we are a global home appliance business selling products around the world. We are proud of our American heritage and ingenuity that have driven innovation for over 100 years.


Manufacturer's Warranty: 1 year

UPC: 883049677606

EAN: 0883049677606

Specs

Dimensions
Depth 27.0 "
Width 27.75 "
Height 40.88 "
Carton Depth 28.88 "
Carton Height 45.63 "
Carton Width 28.88 "
Gross Weight 140 lbs
Depth With Door Open 90 Degree 27.0 "
Maximum Height 44.25 "
Minimum Height 43.25 "
Capacity IEC CAN (cubic feet) 5.5
Height To Top Of Cabinet 38.0 "
 
Cycles
Number Of Wash Cycles 11
Washer Cycle Selections Bulky Items; Normal; Casual; Delicates; Drain & Spin; Quick Wash; Whites; Towels; Colors; Heavy Duty; Clean Washer with affresh
 
Details
Motor Drive Type Belt
Internal Heater No
Maximum Spin Speed Rpm 770
Automatic Load Size Sensing Technology Yes
Out Of Balance Sensing Yes
Wash Action Impeller
Hoses Included No
 
Modifiers
Number Of Wash Rinse Temperatures 5
Temperature Selections Cold; Cool; Tap Cold; Warm; Hot
Number Of Water Levels 4
Number Of Soil Levels 3
Soil Selections Heavy; Light; Medium
Water Levels Auto; Mid; Max; High
 
Exterior
Adjustable Feet Yes
Lid Door Swing N/A
Slow Close Lid Yes
Lid Door Finish Glass
Lid Door Lock Yes
 
Features
Fabric Brush No
Recirculation Visible No
Water Faucet Yes
Pedestal Options N/A
Stackable No
 
Electrical
Amps 7
Watts 120
Hz 60
Power Cord Included Yes
 
Certifications
Energy Rating Kwh Year 340
UL Yes
Energy Star Qualified No
 
Controls
End Of Cycle Signal No
Control Type Knobs
Automatic Temperature Controls Yes
Lcd Touch Screen No
Feedback Status Indicators Sense; Fill/Soak; Wash; Rinse/Spin; Done; Lid Lock
Control Location Rear Console
 
Specifications
Steam No
Extra Power Option No
Sanitize No
Quick Wash Yes
Country Of Origin USA
 
Options
Washer Option Selections Extra Power /Boost Option; Extra Power; Temperature; Soil/Rinse Option; Deep Fill; Faucet

Manuals

There are currently no documents available for this product.

Video

Reviews

Rebates
Warranty
Financing
Install
Basic installation and delivery services are available from CAS
Click here for more details.

Advanced Installation Services (After Delivery)
Offered by Quick Contractors®
CAS Suggested Installation Provider
 1-877-694-3909
To book service online please visit quicktask.com/cas

SELECT CATEGORY FOR A LIST OF AVAILABLE INSTALLATION SERVICES

Refrigerator

Refrigerator Installation Service (New Waterline) by Quick Contractors

Things to note:

  • This service should be purchased if an entirely new waterline is required.
  • If this is replacing your existing refrigerator, our delivery team will uncrate and move your new purchase into place. They will not plug it in.
  • If there is open floor access, 60 feet of waterline will be included in the installation.
  • The Quick Contractors installer will NOT remove packaging or provide haul away services.
  • Refrigerator door reversal service can be added for an extra cost. Please contact your local store for details.

For a full list of requirements or further assistance please call 1-877-694-3909 or visit quicktask.com/cas

Gas Range

Gas Range Installation Service with New Flexible Hose by Quick Contractors

Things to note:

  • This package does NOT include removal of any packaging.
  • This service does NOT include haul away.
  • Extra charges will apply if shut-off valves, gas permits or any custom carpentry work is needed to allow the new appliance to fit.
  • If a completely new installation is required please call 1-877-694-3909 or visit quicktask.com/cas to arrange for an on-site quotation. Once the on-site inspection is completed, a Quick Contractors installer will provide a detailed quotation of the work required and the associated cost. The quote includes all necessary plumbing, electrical, and any other trades and permits required to facilitate the completion of the new installation. All fees for an on-site inspection are non-refundable and must be paid for at your local CAS showroom.

For a full list of requirements or further assistance please call 1-877-694-3909 or visit quicktask.com/cas

WASHER & DRYER

Gas Dryer Installation Service with New Flexible Hose by Quick Contractors

Things to note:

  • This service should be purchased if there was an existing gas dryer in place before.
  • If a completely new installation is required please call 1-877-694-3909 or visit quicktask.com/cas to arrange for an on-site quotation. Once the on-site inspection is completed, a Quick Contractors installer will provide a detailed quotation of the work required and the associated cost. The quote includes all necessary plumbing, electrical, and any other trades and permits required to facilitate the completion of the new installation. All fees for an on-site inspection are non-refundable and must be paid for at your local CAS showroom.
  • The Quick Contractors installer will NOT remove packaging or provide haul away services.
  • Extra charges will apply if any shut-off valves, gas permits, vent-less exhaust kits, conversion kits, vent hose, stacking of items, expansion and reduction adapters, or custom carpentry work is needed to allow the new appliance to fit.


White Glove Dryer (Electric only!) Installation

Things to note:

  • Delivery person will complete this at the time of delivery.
  • Additional charges will apply at point of purchase.



White Glove Washing Machine Installation

Things to note:

  • Delivery person will complete this at the time of delivery.
  • Additional charges will apply at point of purchase.

For a full list of requirements or further assistance please call 1-877-694-3909 or visit quicktask.com/cas

Dishwasher

Dishwasher with Hose Installation and Haul Away Service

Things to note:

  • Delivery person will pick-up and deliver the unit and remove its packaging.
  • This is a basic installation into an existing outlet.
  • A 6 feet stainless steel braided fill hose (supply line) is included with this installation service.
  • Delivery person will haul away the old unit and dispose of all packing and materials.
  • Extra charges will apply if any risers, air gaps, pigtails, elbows, on/off switches, working in crawl spaces, or custom carpentry work is needed to remove old unit.
  • If a completely new installation is required please call 1-877-694-3909 or visit quicktask.com/cas to arrange for an on-site quotation. Once the on-site inspection is completed, a Quick Contractors installer will provide a detailed quotation of the work required and the associated cost. The quote includes all necessary plumbing, electrical, and any other trades and permits required to facilitate the completion of the new installation. All fees for an on-site inspection are non-refundable and must be paid for at your local CAS showroom.


Dishwasher with Hose Installation Service

Things to note:

  • This is a basic installation into an existing outlet.
  • You must remove the packaging prior to the installation.
  • Your unit should be placed near the intended installation site in advance of the Quick Contractor installer's arrival, unless appliance delivery has been purchased.
  • Please disconnect your existing unit.
  • A 6 feet stainless steel braided fill hose (supply line) is included with this installation service.
  • Extra charges will apply if any risers, air gaps, pigtails, elbows, on/off switches, working in crawl spaces, or custom carpentry work is needed to remove the old unit.
  • If a completely new installation is required please call 1-877-694-3909 or visit quicktask.com/cas to arrange for an on-site quotation. Once the on-site inspection is completed, a Quick Contractors installer will provide a detailed quotation of the work required and the associated cost. The quote includes all necessary plumbing, electrical, and any other trades and permits required to facilitate the completion of the new installation. All fees for an on-site inspection are non-refundable and must be paid for at your local CAS showroom.

For a full list of requirements or further assistance please call 1-877-694-3909 or visit quicktask.com/cas

Range Hood

Range Hood (Ductless) Installation by Quick Contractors

Things to note:

  • This service does NOT include haul away and/or disposal of packaging.
  • If a completely new installation is required please call 1-877-694-3909 or visit quicktask.com/cas to arrange for an on-site quotation. Once the on-site inspection is completed, a Quick Contractors installer will provide a detailed quotation of the work required and the associated cost. The quote includes all necessary plumbing, electrical, and any other trades and permits required to facilitate the completion of the new installation. All fees for an on-site inspection are non-refundable and must be paid for at your local CAS showroom.


Range Hood (Ducted) Installation by Quick Contractors

Things to note:

  • This service does NOT include haul away and/or disposal of packaging.
  • If a completely new installation is required please call 1-877-694-3909 or visit quicktask.com/cas to arrange for an on-site quotation. Once the on-site inspection is completed, a Quick Contractors installer will provide a detailed quotation of the work required and the associated cost. The quote includes all necessary plumbing, electrical, and any other trades and permits required to facilitate the completion of the new installation. All fees for an on-site inspection are non-refundable and must be paid for at your local CAS showroom.


Vent Hood or Island Canopy Installation by Quick Contractors

Things to note:

  • This package does NOT include moving the existing duct work, or any drywall patching or painting.
  • This service does NOT include haul away and/or disposal of packaging.
  • If a completely new installation is required please call 1-877-694-3909 or visit quicktask.com/cas to arrange for an on-site quotation. Once the on-site inspection is completed, a Quick Contractors installer will provide a detailed quotation of the work required and the associated cost. The quote includes all necessary plumbing, electrical, and any other trades and permits required to facilitate the completion of the new installation. All fees for an on-site inspection are non-refundable and must be paid for at your local CAS showroom.

For a full list of requirements or further assistance please call 1-877-694-3909 or visit quicktask.com/cas

OTR – Microwave

The Quick Contractors Installer will:

  • Remove packaging from unit and inspect prior to installation
  • Disconnect electrical service to existing OTR
  • Disconnect Duct
  • Mount, center (if possible) and secure support bracket for new OTR as required by manufacturer’s specifics
  • Check and rotate, if necessary, exhaust fan, as required for excising ventilation
  • Connect and seal to existing duct, if necessary
  • Plug OTR cord into receptacle and secure with hardware provided
  • Install all accessory filters, covers, panels and/or racks
  • Test OTR by activating and monitoring a heating cell (using container filled with water), the exhaust fan and all lights and remaining accessories
  • If OTR is mounted using ductless application, installer will ensure accessory charcoal filter is properly installed


Note: All associated packaging of the unit that was installed will be broken down and placed in storage location OR outside as required


Common Overages:

  • Dedicated 110-volt electrical line
  • Changing a round vent to a rectangular vent OR vice versa
  • Installing an electrical receptacle box if improper service was sold
  • Additional duct work to allow transition from eternal exhaust to recirculating OR vise versa
  • Carpentry work to allow new OTR to fit


For a full list of requirements or further assistance please call 1-877-694-3909 or visit quicktask.com/cas

Electric Cooktop

The Quick Contractors Installer will:

  • Remove packaging from unit and inspect prior to installation
  • Set cooktop into opening
  • Extend leveling brackets to floor of cabinet so cooktop sits straight
  • Secure the cooktop to the countertop
  • Screw leveling brackets to bottom of cabinet
  • Run appropriate power cable into cabinet
  • Connect cooktop to electrical box and receptacle
  • Plug cooktop power cord into outlet
  • Test Cooktop by activating and monitoring all surface burner elements, all controls, accessories (Clock, timer, setting, etc.)


Note: All associated packaging of the unit that was installed will be broken down and placed in storage location OR outside as required


Common Overages:

  • Carpentry work to allow the new appliance to fit

For a full list of requirements or further assistance please call 1-877-694-3909 or visit quicktask.com/cas

Gas Cooktop

The Quick Contractors Installer will:

  • Remove packaging from unit and inspect prior to installation
  • Terminate gas service from shut-off valve, verify gas is turned off at shut-off valve and then disconnect gas from appliance. If no shut off valve is present, additional charges can be applied to terminate gas service and install shut-off valve, but not to exceed authorized additional charge estimate provided to customer
  • Secure the Cooktop to the countertop
  • Screw leveling brackets to bottom of cabinet
  • Extend leveling brackets to floor of cabinet so cooktop sits straight
  • Connect cooktop to electrical box and receptacle and plug cooktop power cord into outlet
  • Run appropriate power cable into cabinet
  • Ensure line is capped and there are no leaks
  • Connect gas service and ventilation to new gas appliance
  • Turn gas service back on and test all connections for leaks
  • Monitor gas service and ensure there are no leaks
  • Ensure all accessories; (grease, pants, racks, burner faps, lint filter, etc.) are installed on appliance
  • Test gas appliance by activating and monitoring all surface burner elements, all controls, accessories (Clock, timer, setting, etc.), all ventilation connections (Check exterior wall cap for debris), Ensure all burner elements are adjusted according to display proper flame characteristics
  • Includes new mandatory flex hose required by code


Note: All associated packaging of the unit that was installed will be broken down and placed in storage location OR outside as required


Common Overages:

  • Shut off valve
  • Conversion kits
  • Custom carpentry work to allow the new appliance to fit

For a full list of requirements or further assistance please call 1-877-694-3909 or visit quicktask.com/cas

Wall Oven Single

The Quick Contractors Installer will:

  • A two-person team will install single wall ovens
  • Terminate electrical service for electric oven and disconnect from appliance
  • Ensure electrical cord has been unplugged to prevent damage to receptacle
  • Connect electrical service to new electric oven
  • Ensure all accessories (grates, pants, racks, burns caps, etc.) are installed on appliance
  • Test wall oven by activating and monitoring all surface burner elements, broiler, oven OR interior heating elements, all controls, accessories (clock, timer, setting, etc.), oven door, storage drawer, and ensure all burner elements are adjusted accordingly


Note: All associated packaging of the unit that was installed will be broken down and placed in storage location OR outside as required


Common Overages:

  • Shelf build-up when new unit is shorter than old
  • Converting from gas to electric OR vise versa (may require electrician and/ or local gas provider)
  • Customer carpentry work to allow new appliance to fit

For a full list of requirements or further assistance please call 1-877-694-3909 or visit quicktask.com/cas

BBQ Assembly in Home

The Quick Contractors Installer will:

  • Un-package and inspect the unit to ensure there are no missing or damaged pieces
  • Assembly of the BBQ
  • Installation of any accessories such as the ignitor, side burner, etc.
  • Review installation and proper operation with customer upon completion
  • Final clean up of job site


Note: All associated packaging of the unit that was installed will be broken down and placed in storage location OR outside as required

For a full list of requirements or further assistance please call 1-877-694-3909 or visit quicktask.com/cas

ADDITIONAL SERVICES


If you do not see the service you require, please reach out to us. There are a wide arrangement of services available that may not be listed.


For a full list of requirements or further assistance please call 1-877-694-3909 or visit quicktask.com/cas
Delivery
09CS994 09DF994 09TA994 09HD995 09995 09RO995 09LE998