Midea MRT14D2BST Top Freezer Refrigerator, 28 inch Width, 14.2 cu. ft. Capacity, Stainless Steel colour
Manufacturer's Warranty: 2 years
UPC: 840296506226
EAN: 0840296506226
General Features
Model Number: MRT14D2BST
UPC: 840296506226
Colour: SS
Appliance Type: Top-mounted freezer
Total Capacity (Cu.Ft.): 14.2
Refrigerator Capacity (cu. ft.): 10.53
Freezer Capacity (cu. ft.): 3.67
Reversible Door: Yes
Convertible Between Fridge and Freezer: No
Convertible Keg to Fridge: No
Temperature Control: Electric
Control Type: Electric
Defrost Type: No frost
Defrost Drain: Yes
Power On Indicator: No
Interior Lighting: Yes
Water Filter: No
Water Dispenser: No
Ice Maker: Ice maker ready
Temperature Alarm: No
Security Lock: No
Child Safety Lock: No
Utility/Deli Drawer: No
Physical Features
Dimensions (W x H x D): 27.6*60.6*28.8"
Product Weight (lbs): 144 4
Reversible Door: Yes
Leveling Legs: Yes
Clean Back: N/A
Never Clean Condenser: Yes
Door Handle Design: Recessed handle
Door Finish: SS
Door Hinge Covers: Yes
Door Trim: N/A
Transparent Glass Door: No
Dry Erase Finish: N/A
Cabinet Finish: Black
Refrigerant: R600a
Interior Colour: White
Interior Lighting: Yes/LED
Rollers / Casters: No
Installation Type: N/A
Refrigeration Details
Humidity-Controlled Crisper Drawers: Yes
Crisper Drawer Cover: Yes
Temperature Range (°C): 0°C to 10°C
Number of Shelves: 2
Adjustable Shelves: 2
2-Litre Bottle Storage: Yes
Can Storage: Yes
Wine Rack: No
Cabinet Shelf Type: Adjustable
Cabinet Shelves Material: Glass
Refrigerator Bins: Yes
Removable Bin / Basket: Yes
Refrigerator Drawers: Yes
Number of door shelves: 2
Door shelf material: Plastic
Flexible Door Shelves: No
Dairy Compartment: No
Freezer Details
Freezer Type/ Design: Top-mounted
Temperature Range (°C): −16°C to −24°C
Freezer Shelves: 1
Freezer Shelf Design: Glass
Freezer Bins: 2/Plastic
Number of door shelves: No
Door shelf material: N/A
Flexible Door Shelves: N/A
Electrical
Electrical Requirements (v/Hz): 115/60hz
Voltage (V): 115
Amperage (A): 130
Performance and Certifications
Efficiency Certification: E-star
Safety Certification: UL
Energy Level (kW/yr): 333
Running Amps (A): 130
Noise Level (dB): 42
Warranty
Parts and Labor: 1 year
Compressor: 1 year
Sealed System: 1 year
Experience unparalleled freshness with the 14.2 Cu. Ft. Top-Mounted Freezer Refrigerator in a
sleek stainless steel finish. This refrigerator ensures even cooling throughout with its Multi
Airflow technology, while electronic controls provide precise temperature adjustments for
optimal freshness. The dual crisper drawers lock in moisture to keep fruits and vegetables fresh
longer, and bright LED lighting makes it easy to locate your favorite snacks. Ice maker ready
with a built-in water line and electrical outlet, it offers convenience and quick installation. The
ADA-compliant design enhances accessibility with user-friendly controls and shelving, making it
a practical choice for all.
Key Features:
• Multi Airflow Technology: Ensures even cooling throughout the fridge, keeping food
fresher for longer.
• Dual Crisper Drawers: Locks in moisture to keep fruits and vegetables fresh and
flavorful.
• Ice Maker Ready: Equipped with a water line and outlet for easy connection of an ice
maker.
• Bright LED Lighting: Illuminates every corner for easy access to your snacks and
drinks.
Basic installation and delivery services are available from CAS
Advanced Installation Services (After Delivery)
Offered by Quick Contractors®
CAS Suggested Installation Provider
1-877-694-3909
To book service online please visit quicktask.com/cas
SELECT CATEGORY FOR A LIST OF AVAILABLE INSTALLATION SERVICES
Refrigerator Installation Service (New Waterline) by Quick Contractors
Things to note:
- This service should be purchased if an entirely new waterline is required.
- If this is replacing your existing refrigerator, our delivery team will uncrate and move your new purchase into place. They will not plug it in.
- If there is open floor access, 60 feet of waterline will be included in the installation.
- The Quick Contractors installer will NOT remove packaging or provide haul away services.
- Refrigerator door reversal service can be added for an extra cost. Please contact your local store for details.
Gas Range Installation Service with New Flexible Hose by Quick Contractors
Things to note:
- This package does NOT include removal of any packaging.
- This service does NOT include haul away.
- Extra charges will apply if shut-off valves, gas permits or any custom carpentry work is needed to allow the new appliance to fit.
- If a completely new installation is required please call 1-877-694-3909 or visit quicktask.com/cas to arrange for an on-site quotation. Once the on-site inspection is completed, a Quick Contractors installer will provide a detailed quotation of the work required and the associated cost. The quote includes all necessary plumbing, electrical, and any other trades and permits required to facilitate the completion of the new installation. All fees for an on-site inspection are non-refundable and must be paid for at your local CAS showroom.
Gas Dryer Installation Service with New Flexible Hose by Quick Contractors
Things to note:
- This service should be purchased if there was an existing gas dryer in place before.
- If a completely new installation is required please call 1-877-694-3909 or visit quicktask.com/cas to arrange for an on-site quotation. Once the on-site inspection is completed, a Quick Contractors installer will provide a detailed quotation of the work required and the associated cost. The quote includes all necessary plumbing, electrical, and any other trades and permits required to facilitate the completion of the new installation. All fees for an on-site inspection are non-refundable and must be paid for at your local CAS showroom.
- The Quick Contractors installer will NOT remove packaging or provide haul away services.
- Extra charges will apply if any shut-off valves, gas permits, vent-less exhaust kits, conversion kits, vent hose, stacking of items, expansion and reduction adapters, or custom carpentry work is needed to allow the new appliance to fit.
White Glove Dryer (Electric only!) Installation
Things to note:
- Delivery person will complete this at the time of delivery.
- Additional charges will apply at point of purchase.
White Glove Washing Machine Installation
Things to note:
- Delivery person will complete this at the time of delivery.
- Additional charges will apply at point of purchase.
Dishwasher with Hose Installation and Haul Away Service
Things to note:
- Delivery person will pick-up and deliver the unit and remove its packaging.
- This is a basic installation into an existing outlet.
- A 6 feet stainless steel braided fill hose (supply line) is included with this installation service.
- Delivery person will haul away the old unit and dispose of all packing and materials.
- Extra charges will apply if any risers, air gaps, pigtails, elbows, on/off switches, working in crawl spaces, or custom carpentry work is needed to remove old unit.
- If a completely new installation is required please call 1-877-694-3909 or visit quicktask.com/cas to arrange for an on-site quotation. Once the on-site inspection is completed, a Quick Contractors installer will provide a detailed quotation of the work required and the associated cost. The quote includes all necessary plumbing, electrical, and any other trades and permits required to facilitate the completion of the new installation. All fees for an on-site inspection are non-refundable and must be paid for at your local CAS showroom.
Dishwasher with Hose Installation Service
Things to note:
- This is a basic installation into an existing outlet.
- You must remove the packaging prior to the installation.
- Your unit should be placed near the intended installation site in advance of the Quick Contractor installer's arrival, unless appliance delivery has been purchased.
- Please disconnect your existing unit.
- A 6 feet stainless steel braided fill hose (supply line) is included with this installation service.
- Extra charges will apply if any risers, air gaps, pigtails, elbows, on/off switches, working in crawl spaces, or custom carpentry work is needed to remove the old unit.
- If a completely new installation is required please call 1-877-694-3909 or visit quicktask.com/cas to arrange for an on-site quotation. Once the on-site inspection is completed, a Quick Contractors installer will provide a detailed quotation of the work required and the associated cost. The quote includes all necessary plumbing, electrical, and any other trades and permits required to facilitate the completion of the new installation. All fees for an on-site inspection are non-refundable and must be paid for at your local CAS showroom.
Range Hood (Ductless) Installation by Quick Contractors
Things to note:
- This service does NOT include haul away and/or disposal of packaging.
- If a completely new installation is required please call 1-877-694-3909 or visit quicktask.com/cas to arrange for an on-site quotation. Once the on-site inspection is completed, a Quick Contractors installer will provide a detailed quotation of the work required and the associated cost. The quote includes all necessary plumbing, electrical, and any other trades and permits required to facilitate the completion of the new installation. All fees for an on-site inspection are non-refundable and must be paid for at your local CAS showroom.
Range Hood (Ducted) Installation by Quick Contractors
Things to note:
- This service does NOT include haul away and/or disposal of packaging.
- If a completely new installation is required please call 1-877-694-3909 or visit quicktask.com/cas to arrange for an on-site quotation. Once the on-site inspection is completed, a Quick Contractors installer will provide a detailed quotation of the work required and the associated cost. The quote includes all necessary plumbing, electrical, and any other trades and permits required to facilitate the completion of the new installation. All fees for an on-site inspection are non-refundable and must be paid for at your local CAS showroom.
Vent Hood or Island Canopy Installation by Quick Contractors
Things to note:
- This package does NOT include moving the existing duct work, or any drywall patching or painting.
- This service does NOT include haul away and/or disposal of packaging.
- If a completely new installation is required please call 1-877-694-3909 or visit quicktask.com/cas to arrange for an on-site quotation. Once the on-site inspection is completed, a Quick Contractors installer will provide a detailed quotation of the work required and the associated cost. The quote includes all necessary plumbing, electrical, and any other trades and permits required to facilitate the completion of the new installation. All fees for an on-site inspection are non-refundable and must be paid for at your local CAS showroom.
The Quick Contractors Installer will:
- Remove packaging from unit and inspect prior to installation
- Disconnect electrical service to existing OTR
- Disconnect Duct
- Mount, center (if possible) and secure support bracket for new OTR as required by manufacturer’s specifics
- Check and rotate, if necessary, exhaust fan, as required for excising ventilation
- Connect and seal to existing duct, if necessary
- Plug OTR cord into receptacle and secure with hardware provided
- Install all accessory filters, covers, panels and/or racks
- Test OTR by activating and monitoring a heating cell (using container filled with water), the exhaust fan and all lights and remaining accessories
- If OTR is mounted using ductless application, installer will ensure accessory charcoal filter is properly installed
Note: All associated packaging of the unit that was installed will be broken down and placed in storage location OR outside as required
Common Overages:
- Dedicated 110-volt electrical line
- Changing a round vent to a rectangular vent OR vice versa
- Installing an electrical receptacle box if improper service was sold
- Additional duct work to allow transition from eternal exhaust to recirculating OR vise versa
- Carpentry work to allow new OTR to fit
The Quick Contractors Installer will:
- Remove packaging from unit and inspect prior to installation
- Set cooktop into opening
- Extend leveling brackets to floor of cabinet so cooktop sits straight
- Secure the cooktop to the countertop
- Screw leveling brackets to bottom of cabinet
- Run appropriate power cable into cabinet
- Connect cooktop to electrical box and receptacle
- Plug cooktop power cord into outlet
- Test Cooktop by activating and monitoring all surface burner elements, all controls, accessories (Clock, timer, setting, etc.)
Note: All associated packaging of the unit that was installed will be broken down and placed in storage location OR outside as required
Common Overages:
- Carpentry work to allow the new appliance to fit
The Quick Contractors Installer will:
- Remove packaging from unit and inspect prior to installation
- Terminate gas service from shut-off valve, verify gas is turned off at shut-off valve and then disconnect gas from appliance. If no shut off valve is present, additional charges can be applied to terminate gas service and install shut-off valve, but not to exceed authorized additional charge estimate provided to customer
- Secure the Cooktop to the countertop
- Screw leveling brackets to bottom of cabinet
- Extend leveling brackets to floor of cabinet so cooktop sits straight
- Connect cooktop to electrical box and receptacle and plug cooktop power cord into outlet
- Run appropriate power cable into cabinet
- Ensure line is capped and there are no leaks
- Connect gas service and ventilation to new gas appliance
- Turn gas service back on and test all connections for leaks
- Monitor gas service and ensure there are no leaks
- Ensure all accessories; (grease, pants, racks, burner faps, lint filter, etc.) are installed on appliance
- Test gas appliance by activating and monitoring all surface burner elements, all controls, accessories (Clock, timer, setting, etc.), all ventilation connections (Check exterior wall cap for debris), Ensure all burner elements are adjusted according to display proper flame characteristics
- Includes new mandatory flex hose required by code
Note: All associated packaging of the unit that was installed will be broken down and placed in storage location OR outside as required
Common Overages:
- Shut off valve
- Conversion kits
- Custom carpentry work to allow the new appliance to fit
The Quick Contractors Installer will:
- A two-person team will install single wall ovens
- Terminate electrical service for electric oven and disconnect from appliance
- Ensure electrical cord has been unplugged to prevent damage to receptacle
- Connect electrical service to new electric oven
- Ensure all accessories (grates, pants, racks, burns caps, etc.) are installed on appliance
- Test wall oven by activating and monitoring all surface burner elements, broiler, oven OR interior heating elements, all controls, accessories (clock, timer, setting, etc.), oven door, storage drawer, and ensure all burner elements are adjusted accordingly
Note: All associated packaging of the unit that was installed will be broken down and placed in storage location OR outside as required
Common Overages:
- Shelf build-up when new unit is shorter than old
- Converting from gas to electric OR vise versa (may require electrician and/ or local gas provider)
- Customer carpentry work to allow new appliance to fit
The Quick Contractors Installer will:
- Un-package and inspect the unit to ensure there are no missing or damaged pieces
- Assembly of the BBQ
- Installation of any accessories such as the ignitor, side burner, etc.
- Review installation and proper operation with customer upon completion
- Final clean up of job site
Note: All associated packaging of the unit that was installed will be broken down and placed in storage location OR outside as required
If you do not see the service you require, please reach out to us. There are a wide arrangement of services available that may not be listed.